Carrier WEATHERMAKER 8000 58WAV Operations Instructions Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
Never purge a line into a combustion chamber. Never use
matches, candles, flame, or other sources of ignition for the
purpose of checking leakage. Use a soap-and-water solution
to check for leakage. Failure to follow this warning can cause
a fire, explosion, personal injury, or death.
Table 4—Maximum Capacity of Pipe*
NOMINAL IRON
PIPE SIZE
(IN.)
INTERNAL
DIAMETER
(IN.)
LENGTH OF PIPE (FT)
10 20 30 40 50
1/2 0.622 175 120 97 82 73
3/4 0.824 360 250 200 170 151
1 1.049 680 465 375 320 285
1-1/4 1.380 1400 950 770 660 580
1-1/2 1.610 2100 1460 1180 990 900
* Cubic ft of gas per hr for gas pressures of 0.5 psig (14-in. wc) or less, and a
pressure drop of 0.5-in. wc (based on a 0.60 specific gravity gas). Ref: Table
10-2 NFPA 54-1999.
Install a sediment trap in the riser leading to the furnace. The trap
can be installed by connecting a tee to the riser leading from the
furnace. Connect a capped nipple into the lower end of the tee. The
capped nipple should extend below the level of the gas controls.
(See Fig. 8.)
Apply joint compound (pipe dope) sparingly and only to the male
threads of each joint. The compound must be resistant to the action
of propane gas.
An accessible manual shutoff valve MUST be installed upstream
of the furnace gas controls and within 72 in. of the furnace. A
1/8-in. NPT plugged tapping, accessible for test gage connection,
MUST be installed immediately upstream of the gas supply
connection to the furnace and downstream of the manual shutoff
valve. Place ground joint union between the gas control manifold
and the manual shutoff valve.
Piping should be pressure tested in accordance with local and
national plumbing and gas codes before the furnace has been
attached. If the pressure exceeds 0.5 psig (14-in. wc), the gas
supply pipe must be disconnected from the furnace and capped
before the pressure test. If the test pressure is equal to or less than
0.5 psig (14-in. wc), turn off electric shutoff switch located on the
gas valve before the test. It is recommended that the ground joint
union be loosened before pressure testing. After all connections
have been made, purge the lines and check for leakage with
regulated gas supply pressure.
Step 8—Electrical Connections
115-V WIRING — Refer to the unit rating plate or Table 5 for
equipment electrical requirements. The control system requires an
earth ground for proper operation.
Do not connect aluminum wire between disconnect switch
and furnace. Use only copper wire.
Make all electrical connections in accordance with the National
Electrical Code (NEC) ANSI/NFPA 70-1999 and local codes or
ordinances that might apply. For Canadian installations, all elec-
trical connections must be made in accordance with CSA C22.1
Canadian Electrical Code, or authorities having jurisdiction.
The cabinet MUST have an uninterrupted or unbroken ground
according to NEC, ANSI/NFPA 70-1999 and Canadian
Electrical Code, CSA C22.1 or local codes to minimize
personal injury if an electrical fault should occur. This may
consist of electrical wire or conduit approved for electrical
ground when installed in accordance with existing electrical
codes. Do not use gas piping as an electrical ground. Failure
to follow this warning could result in electrical shock, fire, or
death.
The junction box (J-box) can be moved to the left-hand side of the
furnace when a left-side power supply is desired. Remove the 2
screws holding the auxiliary J-box. Mount the J-box on the
left-hand side of the furnace (holes have been pre-drilled in
casing). When moved, tuck the wiring harness behind the clip
provided to keep extra wire lengths out of the way.
NOTE: Proper polarity must be maintained for 115-v wiring. If
polarity is incorrect, control status indicator light will flash rapidly
and the furnace will not operate.
24-V WIRING
Make field 24-v connections at the 24-v terminal strip. (See Fig.
15.) Connect terminal Y/Y2 as shown in Fig. 9 for proper cooling
operation. Use only AWG No. 18, color-coded, copper thermostat
wire.
The 24-v circuit contains an automotive-type, 3-amp fuse located
on the main control board. Any 24-v shorts during installation,
service, or maintenance could cause this fuse to blow. If fuse
replacement is required, use ONLY a 3-amp fuse of identical size.
ACCESSORIES
1. Electronic Air Cleaner (EAC)
Two quick-connect terminals, marked EAC-1 and EAC-2, are
provided for EAC connection. (See Fig. 15). These terminals
are energized with 115-v, (1.0-amp maximum) during blower
motor operation.
Fig. 8—Typical Gas Pipe Arrangement
A89417
GAS
SUPPLY
MANUAL
SHUTOFF
VALVE
(REQUIRED)
SEDIMENT
TRAP
UNION
8
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 23 24

Comments to this Manuals

No comments