CarrierAirconditioningCompanyGVHermetic Centrifugal Liquid ChillersCONTENTSINTRODUCTIONGeneralJob Data Required Equipment RequiredINITIAL PREPARATIONM
• ^^>4-iXwCr.- ••VJ 'ava>; «O*«®a.b.9. IfFig. 7 — Capacity Control Module (Electronic Control)Check the foregoing motor current calib
ELECTRO-PNEUMATIC RELAYLOCKNUTS SENSITIVITY SCREW^SET POINT SCREWCOVERCONTROL AIR (OUTPUT)This control is factory calibrated to provide a line
FINAL MACHINE ADJUSTMENTTrimming Refrigerant Charge — After the macliine has been placed in operation, it may be necessary to adjust t
ì23456 7 S 3ÎOn— Cooler— Cooler Ret:igerant Level Sight Glass— Low Refrigerant Temoerature Sulb— Thermometer Well— Machir.e Control Ceitter(See Rig.:
1 Serial Numlser idenritica- Tior> Piste2 Oil C^iarairvg Valve3 Gii Heater Tl>erfr;ost3t4 Oil Heater ; ern-.inal Sox5 Oil Reservoir Siijf.t Gla
SEPARABLE UNIONPIPING BY CARRIER FIELD PIPING1. Connect dehydration pump to cooler charging valve.2. Ensure that all valves on purge ass
r.Refrigerant Charge1. Install a charging valve in the 3/4-in. drum opening as shown in Fig. 5.3.4.Fig. 5 — Drum Charging ValveConnect a shor
Check Starter — Before starting the 19CB machine,open the main disconnect and check starter.1. Remove contactor arc chutes. Be sure contactors
With OIL PUMP button depressed, alternately stop and restart chilled water and condenser water pumps. SAFETY CIRCUIT and LOAD RECYCLE li
knob on demand limit control at 100% and turn calibration screw fully clockwise.Place a clamp-on ammeter on one of the 3 starter lead
SAFETY OR CONTROL DEVICETable 4 — Setting Safety Controls (contd)SAFETY OR CONTROL DEVICE5. Low Oil Pressure Cutout (Fig, 2)RESERVOIR PRESSURE-:^,RAN