INSTALLATIO NGUIDELINESAir-cooled GeneratorsNOT INTENDED FOR USE IN CRITICAL LIFE SUPPORT APPLICATIONS.THIS PRODUCT CAN BE INSTALLED BY THE HOMEOWNER
85. There are two locks securing the lid, one on each side. To properly open the lid, press down on the lid above the side lock and unlock the latch.
9FUELCONNECTION HOLE20 kW MAIN AC/CONTROL WIRING CONDUIT HOLE w/CAP PLUG8-17 kW MAIN AC/CONTROL WIRING CONDUIT HOLE w/CAP PLUGREMOTE MONITOR COVER PLA
10Section 3 Site Selection and Preparation MRGLIW1MRMQYQ(MWXERGIMRGLIWMRGLIWMRGLIWMRGLIW MRGLIW)\MWXMRK;EPP2SSTIVEFPI[MRHS[WSV
11Install the generator set, in its protective enclosure, outdoors, where adequate cooling and ventilating air is always available (Figure 1.9). Consi
12Figure 3.2 — Southwest Research Institute Decal (located inside the generator, next to the generator’s data decal)Based on this testing and the requ
13Figure 3.3 — Compacted Gravel SiteFigure 3.4 — Concrete Pad SiteAfter completing your SITE SELECTION and PREPARATION, time for Step 3:SECTION 4 - G
14With the Site Selection and Preparation performed, proceed with placement and installation of the generator itself.All of the air-cooled generators
15After completing GENERATOR PLACEMENT, proceed to Step 4: SECTION 5 — FUEL CONVERSION/GAS REQUIREMENTS/CONNECTIONSSection 5 Fuel Conversion/Gas Req
16NOTE: All pipe sizing, construction and layout must comply with NFPA 54 for natural gas applications and NFPA 58 for liquid propane applications. O
17NOTE: Pipe sizes are using a second stage regulator.Gas pipe sizing is one of the most commonly made mistakes. A properly sized gas pipe is critical
Table of ContentsFrequently Asked Questions (FAQs) ...
182. Most applications will require an external manual full flow shutoff valve on the fuel line.Figure 5.2 — Full Flow Shutoff Valve3. When connecti
194. Never bend the flexible fuel line to avoid using an elbow. Bending the flexible line decreases its ability to absorb vibrations and defeats its
20*9)046)7796)x;'86%41%29%07,983**:%0:)746-1%6=6)+90%83679440-)(&=-278%00-2+'3286%'836&)7846%'8-')
21CONTROL PANEL CONNECTIONSTerminal Numbering Decal Wire NumbersAYELLOW #1 & #2N1 & N2 - 240 VAC - Sensing for Utility Dropout and PickupBWHIT
22NOTE: Torque all wiring lugs, bus bars and connection points to the proper torque specifications. Torque specifications for the Main Line Circuit B
23With the ELECTRICAL CONNECTIONS completed, Step 6: SECTION 7 — CONTROL PANEL/ACTIVATION/START-UP/TESTINGSection 7 Control Panel/Activation/Start-up
24Status message and the current date and time. The highest priority active Alarm and/or Warning will be automatically posted on this page as well, cl
25TROUBLESHOOTINGUse ARROW keys to scroll to desired language. Press ENTER to select.If the wrong language is chosen, it can be changed later using th
26Interconnect System Self Test Feature (follow the on-screen prompts)Upon power up, this controller will go through a system self test which will che
2711. Connect the AC voltmeter test leads across terminal lugs E1 and neutral; then across E2 and neutral. In both cases, voltage reading should be 1
1Q: Do I have to supply the generator with the 100% loaded BTU rated fuel supply and pipe size?A: Yes, the generator needs the 100% loaded BTU fuel r
281. Ensure that the installation has been properly performed as outlined by the manufacturer and that it meets all applicable laws and codes.3. Edu
29Section 8 Quick Reference GuideProblem LED Things to Check Active Alarm SolutionUnit running in AUTO but no power in house.GREEN Check MLCB. NONE
30Section 9 Notes
31
32Section 10 Installation Diagrams
33
Part No. 0J9944SPFR Revision A (03/08/13) Printed in U.S.A.
2Thank you for purchasing this compact, high performance, air-cooled, engine-driven generator. It is designed to automatically supply electrical power
3Save These Instructions – The manufacturer suggests that these rules for safe operation be copied and posted near the unit’s installation site. Safet
4All generators covered by this manual produce dangerous electrical voltages and can cause fatal electrical shock. Utility power delivers extremely hi
5operating appliances.Local code enforcement may require that Arc Fault Circuit Interrupters (AFCIs) be incorporated into the transfer switch distribu
6STEP 5 - Electrical ConnectionsSTEP 6 - Control Panel Activation/Start-up/TestingIf this generator is used to power electrical load circuits normally
71.With the box removed, you can see that this unit came with an automatic transfer switch. The transfer switch is an option and may not be included.
Comments to this Manuals