equipment to dissipate the motor heat as per
the following formula:
Btuh = (FLkW motor) (0.05) (3413)
Btuh = (FLkW motor) (171)
and, alternately
Tons = Btuh/12,000
The additional piping, valves, air-handling
equipment, insulation, wiring, switchgear
changes, ductwork, and coordination with other
trades shall be the responsibility of the mechan-
ical contractor. Shop drawings reflecting any
changes to the design shall be included in the
submittal, and incorporated into the final as-
built drawings for the project.
8. Also, if an open motor is provided, a mechani-
cal room thermostat shall be provided and set
at 104 F (40 C). If this temperature is
exceeded, the chillers shall shut down and an
alarm signal shall be generated to the central
Energy Management System (EMS) display
module, prompting the service personnel to
diagnose and repair the cause of the overtem-
perature condition. The mechanical contractor
shall be responsible for all changes to the
design, including coordination with temperature
control, electrical and other trades. In addition,
the electrical power consumption of any auxil-
iary ventilation and/or mechanical cooling
required to maintain the mechanical room con-
ditions stated above shall be considered in the
determination of conformance to the scheduled
chiller energy efficiency requirement.
D. Unit-Mounted Variable Frequency Drive (VFD) with
Built-In Harmonic LiquiFlo™ II Filter:
The compressor shall be factory-mounted, factory-
wired and factory-tested prior to shipment by the
chiller manufacturer. All interconnecting wiring and
piping between the VFD and the chiller shall be
factory-installed. Customer electrical connection for
compressor motor power shall be limited to main
power leads to the VFD, and wiring liquid pumps
and tower fans to the chiller control circuit. The
VFD shall incorporate the following features:
1. Design:
a. The VFD shall be refrigerant cooled,
microprocessor based, pulse width modu-
lated design. Water cooled designs are not
acceptable.
b. Input and output power devices shall be
Insulated Gate Bipolar Transistors (IGBTs).
c. Rectifier shall convert incoming fixed volt-
age/frequency to fixed DC voltage.
d. Transistorized inverter and control regulator
shall convert fixed DC voltage to a sinusoidal
PWM waveform.
e. Low voltage control sections and main
power sections shall be physically isolated.
f. Integrated controls shall coordinate motor
speed to optimize chiller performance over a
wide variety of operating conditions.
2. Enclosure:
a. Pre-painted unit mounted, NEMA 1 cabinet
shall include hinged, lockable doors and
removable lifting lugs.
b. The VFD shall have a short circuit interrupt
and withstand rating of at least 65,000 amps.
c. Provisions to padlock main disconnect han-
dle in the “Off” positions shall be provided.
Mechanical interlock to prevent opening
cabinet door with disconnect in the “On”
position or moving disconnect to the “On”
position while the door is open shall be
provided.
d. Provisions shall be made for top entry of
incoming line power cables.
3. Heat Sink:
a. The heat sink shall be refrigerant cooled.
Heat sink and mating flanges shall be suit-
able for ASME design working pressure of
185 psig (1276 kPa).
b. Refrigerant cooling shall be metered to
maintain heat sink temperature within
acceptable limits for ambient temperature.
4. VFD Rating:
a. Drive shall be suitable for operation at name-
plate voltage ±10%.
b. Drive shall be suitable for continuous opera-
tion at 100% of nameplate amps and 150%
of nameplate amps for 5 seconds.
c. Drive shall comply with applicable ANSI,
NEMA, UL and NEC standards.
d. Drive shall be suitable for operation in ambient
temperatures between 40 and 122 F (4 and
50 C), 95% humidity (non-condensing) for
altitudes up to 6000 ft (1829 m) above sea
level. Specific drive performance at jobsite
ambient temperature and elevation shall be
provided by the manufacturer in the bid.
5. User Interface:
A single display shall provide interface for pro-
gramming and display of VFD and chiller
parameters. Viewable parameters include:
a. Operating, configuration and fault messages
b. Frequency in hertz
c. Load and line side voltage and current (at the
VFD)
d. kW
e. IGBT temperature
6. VFD Performance:
a. The VFD Voltage Total Harmonic Distortion
(THD) and Harmonic Current Total Demand
Distortion (TDD) shall not exceed IEEE-519
requirements using the VFD circuit breaker
Guide specifications (cont)