Carrier Corporation • Syracuse. N.Y. 13221aEPFICIENCYRATINGCERTIFIEDamaDownflow/Horizontal Induced-DraftGas FurnaceGENERALBefore starting installati
Fig. 18 — Cleaning Heat Exchanger Cell2) Insert brush end of cable into upper opening of cell and slowly rotate with drill. Do not force
S -H THERMOSTAT „„WIRE ENTRY 13..-4"-2lllll HF"1o.. f__ ’ jr__Ì1" 7““'2S POWER ENTRYl^DIA KO.RH.GASENTRYM► ---i"=^ORIBOLTS
Table 3 — Ratings and Performance*FURNACESIZETEMPRISERANGE (F)HEATING COOLINGAPPROX SHIP. WT (lb)INPUT(Btuh)CAPACITY(Btuht)Ext Static Pressure (in. w
THorizontal Attic Installation — The Model 58DH furnace can be installed horizontally on either the left-hand or right-hand side. A typic
Crawl Space Installation — The Model 58DH furnace can be installed horizontally with either the left-hand or right-hand side up. In
See Fig. 12 for wiring diagram showing proper field high- and low-voltage wiring. Use separate fused branch electrical circuit contai
Fig. 14 — Amp Draw Check With AmmeterBLOWER CONTROL CENTER — Furnace features a blower control center. This aids installer and serviceman
START-UP AND ADJUSTMENTIn addition to the following information, refer to Procedures for Induced-Draft Gas-Fired Furnaces packaged with the
3. Check electrical connections for tightness and controls for proper operation each heating season. Service as necessary.\\ \n wiili .m\
Comments to this Manuals