Carrier 58PHA/PHX Installation, start-up, operating and Specifications

Browse online or download Specifications for Water heaters & boilers Carrier 58PHA/PHX Installation, start-up, operating and. Carrier 58PHA/PHX Installation, start-up, operating and Specifications [en] User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 29
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
P056623B
Rev. 2 09/08
HANDBOOK
INSTALLATION & OPERATION
onna-3'
CASES
NARROW MULTI-DECK
General Information ........................................................... 2
Using Outriggers ................................................................ 3
Case Dimensions................................................................ 4
Case Operation ................................................................... 5
Installation ........................................................................... 6
Plumbing ............................................................................. 7
Refrigeration Components ................................................ 8
Refrigeration Piping ........................................................... 9
Electrical Hook-Up....................................................... 10-11
Defrost & Temperature Control ....................................... 12
Air Flow & Product Loading ............................................ 13
Parts Ordering .............................................................14-15
Appendix A: Wiring Diagrams
Appendix B: Control Settings
Appendix C: Use & Maintenance
Table of Contents
Page view 0
1 2 3 4 5 6 ... 28 29

Summary of Contents

Page 1 - HANDBOOK

P056623BRev. 2 09/08HANDBOOKINSTALLATION & OPERATIONonna-3'CASESNARROW MULTI-DECKGeneral Information ...

Page 2

9TXVBulbEvaporatorFansCondenserFansServiceValveTXV1/4”AccessValveEvaporatorCondenserCompressorReceiverServiceValveFilterDrierTankAreaFlow DirectionDua

Page 3 - GENERAL INFORMATION

10CONDENSATE PUMP (connected to junc-tion box receptacle)ELECTRICAL HOOK-UPNo in-field wiring is required for installation of the ONNA - 3': all

Page 4 - USING OUTRIGGERS

11HOW TO ACCESS BALLASTSAn electronic ballast operates the case lamp and is located in the electrical junction box behind the front panel.To gain acce

Page 5 - CASE DIMENSIONS

12DEFROST & TEMP CONTROLTEMPERATURE CONTROL PROBE LOCATION(behind the 3” plug button).The ONNA uses timed-off defrost as its primary defrost metho

Page 6 - CASE OPERATION

13DISCHARGE...1LOAD LIMIT...2 AIR FLOW...3RETURN AIR GRILL...4MODEL ONNAAIR FLOW & PRODUCT LOADINGCase

Page 7 - INSTALLATION

14PARTS ORDERING921222325161110371222436131781353418192015547382928336403132293273014392622171750E06E07E10E11E09MODELONNA

Page 8 - PLUMBING

15 Location Number Part Descriptions 1 Pump Bracket 2 March Pump Model 3 Upper Back Panel 4 Rear Pipe & Wiring Covers 5 Lower R

Page 9 - REFRIGERATION COMPONENTS

APPENDIX A:WIRING DIAGRAMS

Page 11 - ELECTRICAL HOOK-UP

APPENDIX B:CONTROL SETTINGS

Page 12 - HOW TO ACCESS BALLASTS

DANGERRemove hands and feet from beneath the case before the casters are removed. Failure to do so may result in serious injury when the case is lowe

Page 13 - DEFROST & TEMP CONTROL

XR03CX-HF.doc XR03CX& 1/2 D IGITAL CONTROLLER XR03CX 1. CONTENTS 1. Contents _____________________________________

Page 14 - IR FLOW & PRODUCT LOADING

XR03CX-HF.doc XR03CX& 2/2 dP Defrost start after Power failure: (n - y) n= the defrost clock will reset; y= start

Page 15 - PARTS ORDERING

APPENDIX C:USE & MAINTENANCE

Page 16 - (Part Ordering, cont'd)

DANGERElectrical Shock Hazard Always disconnect power to case when servicing or cleaning. HIGHPRESSUREWARNINGSwitch Off Both Power Switches Before P

Page 17 - APPENDIX A:

WARNINGVerify Both Power Switches Are Off Before Cleaning Case.HIGHPRESSUREVerify that both switches were turned are OFF dur-1. ing pre-cleaning. Both

Page 18

CAUTIONThe heating element in the evaporator pan is very hot when on.HIGHPRESSUREIn store service is limited and can be completed in just a few minute

Page 20

NOTES

Page 21

09/08WARRANTYHEREINAFTER REFERRED TO AS MANUFACTURERFOURTEEN MONTH WARRANTY. MANUFACTURER’S PRODUCT IS WARRANTED TO BE FREE FROM DEFECTS IN MATERIAL

Page 22 - USE & MAINTENANCE

1925 Ruffin Mill Road, Colonial Heights, VA 23834Due to our commitment to continuous improvement all specifications are subject to change without noti

Page 23 - IN- STORE SERVICE FOR ONNA-3

2Description of CasesSpecifically covered in this manual is the Model ONNA-3' narrow multi-deck merchandiser. Store ConditionsHill PHOENIX cases

Page 24 - P071253M SERVICE REV 0

3USING OUTRIGGERSHill Phoenix cases are manufactured and shipped to stores with outriggers installed on the base frame. This ensures that moving the

Page 25

428 11/16 in[728.3 cm]85 9/16 in[2174.1 cm]51 5/8 in[1311.6 cm]17 5/16 in[439.4 cm]16 7/8 in[428.1 cm]12 5/16 in[312.4 cm]25 1/2 in[647.3 cm]26 1/2 in

Page 26

5All measurements are taken per CRMA specifications.Electrical DataModelFans per CaseStandard FansCondenserFansDrain PumpEvaporator Pan HeaterDrain He

Page 27

6INSTALLATIONBASE FRAMEFRONT PANELKICKPLATEThe ONNA-3' is shipped with most of the exterior panels and trim already installed. The only exterior

Page 28 - WARRANTY

7PLUMBINGAll of the plumbing components are attached to the case at the factory; therefore, no assembly is required. The case drain is located front-

Page 29 - Maintenance & Case Care

8REFRIGERATION COMPONENTSAccess Valve - Access port on the evaporator that allows service personnel to check system pressure.Accumulator - A device in

Comments to this Manuals

No comments