4.5 - Coolers
- Check the connections in accordance with the dimensional
drawing.
- Control the connections for leaks.
- Check drain trap. If CHH standard siphon trap is used,
check it has been correctly installed. Check if siphon
cover and ball have been correctly installed.
- Check if the droplet eliminator after the cooler has been
correctly installed.
- Check if fins have been bent during transport. Correctly
straighten the fins.
- If a cooling coil is incorporated, after several days of
cooling operation check the condensate drain and opera-
tion of the plastic siphon. If necessary clean the siphon.
4.6 - Heat recovery wheel
- Check that the wheel is rotating in the correct direction.
This is indicated by an arrow on the casing.
- Check if the wheel seals are fitting correctly.
- Check if belt tension is correct.
- Check if the motor and the rotation monitor have been
correctly connected.
- Check if the controller has been correctly connected and
set in accordance with the instructions of the supplier.
- Check if the rotor speed has been set correctly.
- The following warning pictogram is attached to the panel:
rotating parts.
4.7 - Plate heat exchanger
Used if dampers are installed.
- Check if the actuator motor has been installed in
accordance with the instructions of the supplier.
- Check if the correct angle has been set.
- Check if the dampers close correctly.
- Check if the damper can open to the correct position.
- Check operation after the power has been restored
following a power cut. Some dampers must be open,
others must be closed.
- Check if fins have been bent during transport. Correctly
straighten the fins.
- Check if the siphon has been correctly installed. Check if
siphon cover and ball have been correctly installed.
4.8 - Direct steam humidification
- Check the fixing of the steam pipe.
- Check the steam supply and condensate drain pipes.
- For longer pipes install an extra condensate pan in
accordance with the instructions of the supplier.
- Check if the pollution trap has been installed.
- The condensate drain should not be without pressure in
accordance with the manufacturer’s instructions. Refer to
the instructions of the supplier.
- If the AHU has negative pressure, install a special siphon
ahead of the condensate drain.
- Before starting up the steam humidifier steam must be
introduced slowly into the system to bring the humidifier
to the correct operating temperature. Once the condensate
pipe has reached the operating temperature, start the actuator
motor electrically or pneumatically and set the desired
humidity level. Refer to the instructions of the supplier.
- A few days after starting up the unit clean the sieve of the
pollution trap and check the condensate drain. For casings
with negative pressure the operation of the negative
pressure system must be controlled with the check valve.
- The following warning pictogram is attached to the panel:
hot surface.
4.9 - Electrical steam humidification
- Check the fixing of the steam generator.
- Check the steam supply and condensate drain pipes.
- The condensate drain should not be without pressure in
accordance with the manufacturer’s instructions. Refer to
the instructions of the supplier.
- If the AHU has negative pressure, install a special siphon
ahead of the condensate drain.
- Check the voltage and measure the total current draw.