Fig. 37—Control Center
A02278
FLASH
UPGRADE
CONNECTOR
(FACTORY
ONLY)
ACRDJ – AIR
CONDITIONING
RELAY DISABLE
JUMPER
HUMIDIFIER
TERMINAL (24-VAC
0.5 AMP MAX.
CONTINUOUS FAN
(CF) AIRFLOW
SETUP SWITCHES
COMMUNICATION
CONNECTOR
AIR CONDITIONING
(A/C) AIRFLOW
SETUP SWITCHES
MODEL PLUG
CONNECTOR
SW1 SETUP
SWITCHES AND
BLOWER OFF-
DELAY
STATUS AND COMM
LED LIGHTS
3-AMP FUSE
TRANSFORMER 24-VAC
CONNECTIONS
PL3 – ECM BLOWER
HARNESS
CONNECTOR
PL1 – LOW VOLTAGE MAIN
HARNESS CONNECTOR
EAC-1 TERMINAL
(
115-VAC 1.0 AMP MAX.
)
115-VAC (L1) LINE
VOLTAGE CONNECTIONS
115-VAC (L2) NEUTRAL
CONNECTIONS
PL2 – HOT SURFACE
IGNITER & INDUCER
MOTOR CONNECTOR
24-V THERMOSTAT
TERMINALS
FUTURE
APPLICATIONS
Table 7—Approved Combustion-Air and Vent Pipe, Fitting and Cement Materials
ASTM SPECIFICATION
(MARKED ON MATERIAL)
MATERIAL PIPE FITTINGS SOLVENT CEMENT AND PRIMERS DESCRIPTION
D1527 ABS Pipe Schedule-40
D1785 PVC Pipe Schedule-40
D2235 For ABS
Solvent
Cement
For ABS
D2241 PVC Pipe SDR-21 & SDR-26
D2466 PVC Fittings Schedule-40
D2468 ABS Fittings Schedule-40
D2564 For PVC
Solvent
Cement
For PVC
D2661 ABS Pipe Fittings DWV at Schedule-40 IPS sizes
D2665 PVC Pipe Fittings DWV
F438 CPVC Fittings Schedule-40
F441 CPVC Pipe Schedule-40
F442 CPVC Pipe SDR
F493 For CPVC
Solvent
Cement
For CPVC
F628 ABS Pipe Cellular Core DWV at Schedule-40 IPS sizes
F656 For PVC Primer For PVC
F891 PVC Pipe Cellular Core Schedule-40 & DWV
30