does not obstruct drainage holes (holes drain water
during heating and defrost cycles). Attach unit to
pad with 1/4-in. mounting bolts. Position tiedown
bolts in pad. Any 2 holes in unit basepan may be
used to fasten unit to pad.
Construct round, 23-in. diameter pad a mihimum
of 6 in. above grade to provide clearance under holes
for drainage and ice build-up. In areas where pro
longed subfreezing temperatures or heavy snows
occur: increase clearance from 12 to 18 in. by con
structing an angle-iron frame to support unit 12 to
18 in. off concrete base. Cross angle of frame must
not obstruct coil drainage holes. See Fig. 5 for
recommended frame construction. Extend a 12-in.
gravel apron around pad for condensate and defrost
water drainage field.
Fig. 5 — Mounting the Outdoor Coil
4