Carrier 50YQ User Manual

Browse online or download User Manual for Pumps Carrier 50YQ. Carrier 50YQ User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 16
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Jrt<twnna y >' ^
Numb^One
AirConditbning
Maker
e
Division of
Carrier Cotporalio
installation, Start-llp
and Service instructior^
Carrier Parkway • Syracuse NY 13221
Single-Package Heat Pumps
INDEX
Page
1
, 1-4
. 1
SAFETY CONSIDERATIONS
.........................
INSTALLATION
.................................................
Step 1 — Check Equipment and Jobsite
UNPACKAGE UNITS
INSPECT EQUIPMENT
COMPLETE OR CONSIDER SYSTEM
REQUIREMENTS
Step 2 — Mount Heat Pump Package ..
ON THE GROUND: MOUNT HEAT
PUMP ON AN ELEVATED FRAME
POSITIONED ON A LEVEL CON
CRETE PAD
ON THE ROOF: MOUNT UNIT ON A
LEVEL PLATFORM OR FRAME
Step 3 — Make Ductwork Connections
CONNECT SUPPLY AND RETURN
AIR DUCTWORK
^ SAFETY CONSIDERATIONS
Installation and servicing of air conditioning
equipment can be hazardous due to system pressure
and electrical components. Only trained and quali
fied service personnel should install, repair or
service air conditioning equipment.
Untrained personnel can perform basic main
tenance functions of cleaning coils and filters and
replacing filters. All other operations should be per
formed by trained service personnel. When working
on air conditioning equipment, observe precautions
in the literature, tags and labels attached to the unit
and other safety precautions that may apply.
Follow all safety codes. Wear safety glasses and
work gloves. Use quenching cloth for brazing oper
ations. Have fire extinguisher available for all braz
ing operations.
Step 4 — Provide for Cooling Cycle
Condensate Disposal for Cooling Cycle ... 4
CONNECT DRAIN LINE
^Step 5 — Make Electrical Connections... 4
INSTALL A BRANCH CIRCUIT
DISCONNECT PER NEC
ROUTE LINE POWER WIRES INTO
UNIT
CONNECT GROUND LEAD TO GROUND
LUG IN SPLICE BOX FOR SAFETY
SET INDOOR FAN MOTOR SPEED
ROUTE CONTROL POWER WIRES
ELECTRIC HEATER INSTALLATION
START-UP.............................................................5-7
SERVICE .............................................................7-14
V TROUBLESHOOTING
..................................
15, 16
INSTALLATION
Step 1 — Check Equipment and Jobsite
UNPACKAGE UNITS Move units to final loca
tion. Slide units from cartons taking special care nob
to damage unit.
INSPECT EQUIPMENT — File claim with ship
ping company if shipment is damaged or incomplete.
COMPLETE OR CONSIDER SYSTEM RE
QUIREMENTS before installing the 50YQ units.
Consult local building codes and National Elec
trical Code (NEC) for special installation
requirements.
Provide sufficient space for coil airflow clearance,
wiring, and servicing unit. (See Fig. 1.) Locate unit
where supply and return air ducts can be con
veniently brought out to unit duct connections.
Unit may be placed with duct side as close to
building as condensate drain, top removal, duct con
nections and power connections permit. Position
unit so water or ice from roof does not drop directly
on top of unit or in front of coil. Make provisions for
condensate drainage and defrost water disposal.
Roof installation method for 50YQ depends on
building construction and special requirements of
local building codes. Ensure that roof can support
unit weight. Protect unit from prevailing winds to
ensure adequate defrost.
© Carrier Corporation 1979 781 Form 50YQ-3SI
Page view 0
1 2 3 4 5 6 ... 15 16

Summary of Contents

Page 1 - Single-Package Heat Pumps

Jrt<twnna y >' ^Numb^One AirConditbning MakereDivision of Carrier Cotporalioinstallation, Start-llp and Service instructior^Carrier Parkwa

Page 2 - '-6j3^

Fig. 15 — Cooling Charging Chart — 50YQ048Fig. 17 — Heating Operation Check Chart — 50YQ0244050 60 70 80 90SUCTION PRESSURE @ SCHRADER VALVE (PSIG

Page 3 - 3 3}í(J}fiS£0

Fig. 19 — Heating Operation Check Chart 50YQ03610 20 30 40 50 60 70SUCTION PRESSURE @ SCHRADER VALVE (PSIG)Fig. 21 — Heating Operation Check Cha

Page 4 - ¡i DKO LINE

AccuRater™ (Dual-Piston Type) Servicing —See Fig. 23 for dual-piston AccuRater components. The pistons have a refrigerant metering orifice thru them

Page 5 -

11. Clean system. Add new suction line filter-drier as described below.NOTE: If a compressor failure was caused by motor winding burnout, t

Page 6 - Fig. 8 — Control Connections

6. Reassemble in reverse order.To clean fan wheel and housing, use a brush, warm water and detergent. Do not splash water on motor.Fig. 25 —

Page 7

VTROUBLESHOOTING CHART — COOLING CYCLE

Page 8 - Table 4 — Service Data

UJ_lO>ooz1-<liJXQC<XoOzI-ooX(/)LU_lCQDOXI-For replacement items use Carrier Specified Parts.Manufacturer reserves the right to discontinue, o

Page 9

g CONDUITCONTROL-*“»WIRING0'-6j3^If DKO ELECTRIC^ HEAT Xl| DKO LINE WIRING' CONNFig. 1L> INDOOR AIRFLOW ^ OUTDOOR AIRFLOW RIGHT SIDE VI

Page 10 - 50 60 70 80 90

iz TOS'«0C□ «Sy iSJRSS<D’=O'i-3 3}í(J}fiS£0!_re“ fc&5 fíBiAjrets íftOfí - li TO f-s COMMt STO { POTAL í&6ftMTrTY 2Sf 7035Ÿ >

Page 11 - @ SCHRADER VALVE (PSIG)

g. Secure all ducts to building structure. Weatherproof duct openings in wall or roof according to good construction practices."Separate dis

Page 12 - Table 5 — Compressor Data

Table 2 — Unit Electrical Data (60-Hz)i-r'tvOPERCOMPRESSORIFMOFMBRANCH CIRCUITVOLTAGE*MinMaxFtWireMin GndMax FuseMinCircuitAmpsMODELV/PHMax MinLR

Page 13 - INDOOR COIL

MOUNT OUTDOOR THERMOSTAT(S) — Locate maximum of 2 outdoor thermostats in the compressor section on the partition to the left of the reversin

Page 14

If start thermistor is good and compressor does not start, disconnect the thermistor from starting circuit and give compressor a tem

Page 15

Table 4 — Service DataUNIT 50YQ024030 036042048060R-22 CHARGE* (lb)54 5 7 5 156 77 38 6Refrig ControlAccuRater^MINDOOR FANCentrifugal — Direct Drive —

Page 16

SUCTION PRESSURE <§) SCHRADER VALVE (PSIG)Fig. 11 — Cooling Charging Chart — 50YQ024Fig. 13 — Cooling Charging Chart — 50YQ036Fig. 12 — Cooling Cha

Comments to this Manuals

No comments