Carrier 19XL Specifications Page 38

  • Download
  • Add to my manuals
  • Print
  • Page
    / 80
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 37
11. Connect the RED wire to the matching location on the terminal strip.
12. Connect the WHITE wire to the matching location on the terminal strip.
13. Connect the BLACK wire to the matching location on the terminal strip.
Install Field Insulation
When installing insulation at the job site, insulate the following components:
compressor motor
cooler shell
cooler tube sheets
suction piping
motor cooling drain
oil reclaim piping
oil cooler refrigerant side tubing
refrigerant liquid line to cooler
CAUTION
CAUTION
!
Protect insulation from weld heat damage and weld splatter. Cover with wet can-
vas cover during water piping installation.
Page view 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 79 80

Comments to this Manuals

No comments