Carrier 19XL Specifications Page 29

  • Download
  • Add to my manuals
  • Print
  • Page
    / 80
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 28
length of flexible tubing or piping near the device is essential on spring-isolated machines.
4. Cover the outdoor vent with a rain cap and place a condensation drain at the low point in
the vent piping to prevent water build-up on the atmospheric side of the relief device.
Make Electrical Connections
Field wiring must be installed in accordance with job wiring diagrams and all applicable
electrical codes.
Wiring diagrams in this publication (Figure 22, Figure 23, Figure 24, Figure 25, Figure 26,
Figure 27, Figure 28, and Figure 29) are for reference only and are not intended for use during
actual installation; follow job specific wiring diagrams.
CAUTION
CAUTION
!
Do not run 120-v wiring into the control cabinet. The control cabinet should only
be used for additional extra low-voltage wiring (50 v maximum).
Page view 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 79 80

Comments to this Manuals

No comments