Carrier 19XL Specifications Page 27

  • Download
  • Add to my manuals
  • Print
  • Page
    / 80
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 26
7. Install waterbox vent and drain piping in accordance with individual job data. All
connections are 3/4 -in. FPT.
8. Install waterbox drain plugs in the unused waterbox drains and vent openings.
9. Install optional pumpout system or pumpout system and storage tank as shown in
Figure 17, Figure 18, Figure 19, and Figure 20.
Figure 15 — Typical Nozzle Piping
Figure 16 — Piping Flow Data
Figure 17 — Optional Pumpout System and/or Storage Tank
Figure 18 — Optional Pumpout System Piping Schematic with Storage Tank
Figure 19 — Optional Pumpout System Piping Schematic without Storage Tank
Page view 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 79 80

Comments to this Manuals

No comments