Carrier 58GC Specifications

Browse online or download Specifications for Water heaters & boilers Carrier 58GC. Carrier 58GC Specifications User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 140
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews

Summary of Contents

Page 1 - Agilent GC, GC/MS, and

Agilent Technologies Agilent GC, GC/MS, and ALSSite Preparation Guide

Page 2 - Safety Notices

7890 Series GC Site Preparation 10 GC, GC/MS, and ALS Site Preparation GuideRecommended for TCD/ECD, MS, and MSD:GC Supply Gas Installation Kit 19199

Page 3 - Contents

6850 Series GC Site Preparation 100 GC, GC/MS, and ALS Site Preparation Guide

Page 4

101GC, GC/MS, and ALSSite Preparation GuideAgilent Technologies37820 MSD Site PreparationCustomer Responsibilities 102Basic Tools and Consumable Su

Page 5 - 3 7820 MSD Site Preparation

7820 MSD Site Preparation 102 GC, GC/MS, and ALS Site Preparation GuideCustomer ResponsibilitiesThe specifications in this manual outline the necessa

Page 6

7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 103Agilent Technologies Installation and Familiarization ServicesIf you purchased

Page 7

7820 MSD Site Preparation 104 GC, GC/MS, and ALS Site Preparation GuideBasic Tools and Consumable SuppliesThe GC comes with a few basic tools and con

Page 8

7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 105Table 50 lists consumables that you may wish to order. First time GC users shou

Page 9 - Installation Kits

7820 MSD Site Preparation 106 GC, GC/MS, and ALS Site Preparation GuideDimensions and WeightSelect the laboratory bench space before the system arriv

Page 10

7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 107A 7820 MSD system that includes a GC, ALS injector, 5977 or 5975 MSD and a comp

Page 11

7820 MSD Site Preparation 108 GC, GC/MS, and ALS Site Preparation GuidePower ConsumptionTable 52 lists site power requirements.• The number and type

Page 12 - Hydrogen Carrier Gas

7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 109Although your GC should arrive ready for operation in your country, compare its

Page 13

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 11You must also provide the fittings and reducers required to convert the cy

Page 14

7820 MSD Site Preparation 110 GC, GC/MS, and ALS Site Preparation GuideThe three- conductor power line cord, when plugged into a properly grounded re

Page 15

7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 111India, South Africa 240 15 4.5 AS 3112 Japan 200 20 4.5 NEMA L6-20PUnited Kingd

Page 16 - 7693 ALS

7820 MSD Site Preparation 112 GC, GC/MS, and ALS Site Preparation GuideHeat DissipationUse Table 54 to estimate the additional BTUs of heat dissipat

Page 17 - 148 cm (4.8 ft)

7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 113Exhaust VentingHot air (up to 425 °C) from the oven exits through a vent in the

Page 18 - 7200 Flight tube

7820 MSD Site Preparation 114 GC, GC/MS, and ALS Site Preparation GuideEnvironmental ConditionsOperating the instrument within the recommended ranges

Page 19

7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 115Gas and Reagent SelectionThe 7820 MSD system (GC and MSD) requires helium or hy

Page 20

7820 MSD Site Preparation 116 GC, GC/MS, and ALS Site Preparation GuideGas and Reagent PurityAgilent recommends that carrier and detector gases be 99

Page 21

7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 117Gas SuppliesGeneral requirementsSupply instrument gases using tanks, an interna

Page 22

7820 MSD Site Preparation 118 GC, GC/MS, and ALS Site Preparation GuideConversions: 1 psi = 6.8947 kPa = 0.068947 Bar = 0.068 ATMRequirements for hyd

Page 23 - Canadian installation

7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 119GC/MS Gas and Reagent RequirementsSee the appropriate tables for gas and reagen

Page 24

7890 Series GC Site Preparation 12 GC, GC/MS, and ALS Site Preparation GuideHydrogen Carrier GasIf planning to use hydrogen carrier gas, note that sp

Page 25

7820 MSD Site Preparation 120 GC, GC/MS, and ALS Site Preparation GuideTable 62 lists typical flows resulting from selected carrier and reagent gas s

Page 26

7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 121Gas PlumbingWARNINGAll compressed gas cylinders should be securely fastened to

Page 27

7820 MSD Site Preparation 122 GC, GC/MS, and ALS Site Preparation Guide• If you have not requested option 305 (pre- plumbed tubing), you must supply

Page 28

7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 123Supply tubing for most carrier and detector gasesUse only preconditioned copper

Page 29

7820 MSD Site Preparation 124 GC, GC/MS, and ALS Site Preparation Guide• Do not re- use old tubing when installing or switching to hydrogen carrier g

Page 30

7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 125The type of regulator you use depends on the gas type and supplier. The Agilent

Page 31

7820 MSD Site Preparation 126 GC, GC/MS, and ALS Site Preparation Guidefilters are designed for use with the GC, GC/MS, ICP- OES, ICP- MS, LC/MS, and

Page 32

7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 127Table 6 4 Connection diagrams for common detectors ECDElectron Capture Detector

Page 33

7820 MSD Site Preparation 128 GC, GC/MS, and ALS Site Preparation GuideTable 65 lists the most common Gas Clean Filter system kits. See the Agilent o

Page 34

7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 129Each separate gas supply requires its own filters. Table 6 5 Recommended Gas Cl

Page 35

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 13Dimensions and WeightSelect the laboratory bench space before the system a

Page 36

7820 MSD Site Preparation 130 GC, GC/MS, and ALS Site Preparation GuideMaximum Length of CablesThe distance between system modules may be limited by

Page 37

7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 131Site LAN NetworkIf you intend to connect your system to your site’s LAN network

Page 38

7820 MSD Site Preparation 132 GC, GC/MS, and ALS Site Preparation GuidePC RequirementsAny 7820 GC/MSD system requires Agilent control software. For P

Page 39

133GC, GC/MS, and ALSSite Preparation GuideAgilent Technologies47693A and 7650 Automatic Liquid Sampler Site PreparationCustomer Responsibilities 1

Page 40

7693A and 7650 Automatic Liquid Sampler Site Preparation 134 GC, GC/MS, and ALS Site Preparation GuideCustomer ResponsibilitiesThe specifications in

Page 41

7693A and 7650 Automatic Liquid Sampler Site Preparation GC, GC/MS, and ALS Site Preparation Guide 135Basic Tools and Consumable SuppliesThe 7693A and

Page 42

7693A and 7650 Automatic Liquid Sampler Site Preparation 136 GC, GC/MS, and ALS Site Preparation GuideVial racks (7693A)9301-0722 Rack for 12 mm, 2 m

Page 43

7693A and 7650 Automatic Liquid Sampler Site Preparation GC, GC/MS, and ALS Site Preparation Guide 137Dimensions and WeightSelect the laboratory bench

Page 44

7693A and 7650 Automatic Liquid Sampler Site Preparation 138 GC, GC/MS, and ALS Site Preparation GuidePower ConsumptionThe ALS components draw power

Page 45

7693A and 7650 Automatic Liquid Sampler Site Preparation GC, GC/MS, and ALS Site Preparation Guide 139Chiller SuppliesIf using the optional G4522A Coo

Page 46

7890 Series GC Site Preparation 14 GC, GC/MS, and ALS Site Preparation Guide• Performance turbo pump 41 cm (16 in) 30 cm (12 in) 54 cm (22 in) 41 kg

Page 47

7693A and 7650 Automatic Liquid Sampler Site Preparation 140 GC, GC/MS, and ALS Site Preparation Guide

Page 48

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 15A system that includes a 7890 Series GC, a 5977, 5975 or 7000 MS, an ALS,

Page 49

7890 Series GC Site Preparation 16 GC, GC/MS, and ALS Site Preparation GuideFigure 1 Front view of example installation, 7890B GC/5977 MSD system wit

Page 50

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 17A 7890 Series system that includes a GC, a Q- TOF MS, an ALS, and a comput

Page 51

7890 Series GC Site Preparation 18 GC, GC/MS, and ALS Site Preparation Guide(1 ft) of space behind the instrument for air circulation, the vacuum pum

Page 52 - Using carbon dioxide

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 19If using an ion trap MS:The vacuum hose connecting the Ion Trap MS to the

Page 53 - Dip tube

2 GC, GC/MS, and ALS Site Preparation GuideNotices© Agilent Technologies, Inc. 2013No part of this manual may be reproduced in any form or by any mean

Page 54 - Using liquid nitrogen

7890 Series GC Site Preparation 20 GC, GC/MS, and ALS Site Preparation GuidePower ConsumptionTable 3 lists site power requirements.• The number and t

Page 55 - Using compressed air

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 21220/240 Ion Trap MS200 (+/–10%)50/60 ± 5% 1500 6 10 Amp Dedicated220/240 I

Page 56

7890 Series GC Site Preparation 22 GC, GC/MS, and ALS Site Preparation GuideAlthough your GC should arrive ready for operation in your country, compa

Page 57

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 23USA fast heating oven, 240 VThe 240 V fast heating oven requires 240 V/15

Page 58

7890 Series GC Site Preparation 24 GC, GC/MS, and ALS Site Preparation GuideEurope, Korea 220 / 230 / 24010 2.5 CEE/7/V11Denmark, Switzerland 230 16

Page 59 - Agilent Technologies

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 25United States 120 20, 12 AWG 4.5 NEMA 5-20PUnited States 240 15, 14 AWG 2.

Page 60

7890 Series GC Site Preparation 26 GC, GC/MS, and ALS Site Preparation GuideHeat DissipationUse Table 5 to estimate the additional BTUs of heat diss

Page 61

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 27Exhaust VentingHot air (up to 450 °C) from the oven exits through a vent i

Page 62

7890 Series GC Site Preparation 28 GC, GC/MS, and ALS Site Preparation GuideFigure 4 Exhaust deflector G1530-80650During normal operation of the GC w

Page 63

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 29Environmental ConditionsOperating the instrument within the recommended ra

Page 64 - Table 2 9 Installation kits

GC, GC/MS, and ALS Site Preparation Guide 3Contents1 7890 Series GC Site PreparationCustomer Responsibilities 8Installation Kits 9Hydrogen C

Page 65

7890 Series GC Site Preparation 30 GC, GC/MS, and ALS Site Preparation GuideMS7000 Triple Quad MS Operation 15 to 35 °C † (59 to 95 °F)40 to 80% 5,00

Page 66

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 31Gas and Reagent SelectionTable 7 lists gases usable with Agilent GCs and c

Page 67

7890 Series GC Site Preparation 32 GC, GC/MS, and ALS Site Preparation GuideTable 8 lists gas recommendations for packed column use. In general, make

Page 68

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 33Table 9 Gases and reagents required for checkout Detector Gases requiredFI

Page 69

7890 Series GC Site Preparation 34 GC, GC/MS, and ALS Site Preparation GuideGas and Reagent PurityAgilent recommends that carrier and detector gases

Page 70

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 35Gas SuppliesGeneral requirementsSupply instrument gases using tanks, an in

Page 71

7890 Series GC Site Preparation 36 GC, GC/MS, and ALS Site Preparation GuideThe minimum supply pressure for Auxiliary EPC and PCM modules is 138 kPa

Page 72

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 37Requirements for hydrogen as a carrier gasNot all systems can use hydrogen

Page 73

7890 Series GC Site Preparation 38 GC, GC/MS, and ALS Site Preparation GuideGC/MS Gas and Reagent RequirementsSee the appropriate tables for gas and

Page 74

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 39Table 17 lists the limits on total gas flow into the 5977 Series MSD. Maxi

Page 75

4 GC, GC/MS, and ALS Site Preparation GuideMaximum Length of Cables and Hoses 56Site LAN Network 57PC Requirements 582 6850 Series GC

Page 76

7890 Series GC Site Preparation 40 GC, GC/MS, and ALS Site Preparation GuideTable 18 lists typical flows resulting from selected carrier and reagent

Page 77

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 41Table 20 lists typical flows resulting from selected carrier and reagent g

Page 78 - Gas Selection

7890 Series GC Site Preparation 42 GC, GC/MS, and ALS Site Preparation GuideTable 22 lists typical flows resulting from selected carrier and reagent

Page 79 - Table 37

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 43Gas PlumbingWARNINGAll compressed gas cylinders should be securely fastene

Page 80

7890 Series GC Site Preparation 44 GC, GC/MS, and ALS Site Preparation Guide• If you have not requested option 305 (pre- plumbed tubing), you must su

Page 81

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 45Supply tubing for most carrier and detector gasesUse only preconditioned c

Page 82

7890 Series GC Site Preparation 46 GC, GC/MS, and ALS Site Preparation Guide• Do not re- use old tubing when installing or switching to hydrogen carr

Page 83

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 47The type of regulator you use depends on the gas type and supplier. The Ag

Page 84 - GC/MS Gas Requirements

7890 Series GC Site Preparation 48 GC, GC/MS, and ALS Site Preparation Guidefilters are designed for use with the GC, GC/MS, ICP- OES, ICP- MS, LC/MS

Page 85

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 49Table 2 4 Connection diagrams for common detectors ECDElectron Capture Det

Page 86

GC, GC/MS, and ALS Site Preparation Guide 5Site LAN Network 98PC Requirements 993 7820 MSD Site PreparationCustomer Responsibilities 1

Page 87

7890 Series GC Site Preparation 50 GC, GC/MS, and ALS Site Preparation GuideTable 25 lists the most common Gas Clean Filter system kits. See the Agil

Page 88

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 51Each separate gas supply requires its own filters. See also “Installation

Page 89

7890 Series GC Site Preparation 52 GC, GC/MS, and ALS Site Preparation GuideCryogenic Cooling RequirementsCryogenic cooling allows you to cool the ov

Page 90

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 53Additional requirements for the liquid CO2 system include:• The tank must

Page 91

7890 Series GC Site Preparation 54 GC, GC/MS, and ALS Site Preparation GuideUsing liquid nitrogenLiquid nitrogen is supplied in insulated Dewar tanks

Page 92

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 55Using compressed airThe multimode inlet can also use compressed air coolin

Page 93

7890 Series GC Site Preparation 56 GC, GC/MS, and ALS Site Preparation GuideMaximum Length of Cables and HosesThe distance between system modules may

Page 94

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 57Site LAN NetworkIf you intend to connect your system to your site’s LAN ne

Page 95

7890 Series GC Site Preparation 58 GC, GC/MS, and ALS Site Preparation GuidePC RequirementsIf using an Agilent data system, refer to the data system

Page 96

59GC, GC/MS, and ALSSite Preparation GuideAgilent Technologies26850 Series GC Site PreparationCustomer Responsibilities 60Basic Tools and Installat

Page 97

6 GC, GC/MS, and ALS Site Preparation Guide4 7693A and 7650 Automatic Liquid Sampler Site PreparationCustomer Responsibilities 134Basic Tools an

Page 98

6850 Series GC Site Preparation 60 GC, GC/MS, and ALS Site Preparation GuideCustomer ResponsibilitiesThe specifications in this manual outline the ne

Page 99

6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 61Basic Tools and Installation KitsThe GC/MS comes with a few basic tools an

Page 100

6850 Series GC Site Preparation 62 GC, GC/MS, and ALS Site Preparation GuideTable 28 lists consumables that you may wish to order. First time GC user

Page 101 - 7820 MSD Site Preparation

6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 63Agilent offers several installation kits that provide parts useful during

Page 102 - Customer Responsibilities

6850 Series GC Site Preparation 64 GC, GC/MS, and ALS Site Preparation GuideTable 2 9 Installation kits Kit Part number Kit contentsRecommended for F

Page 103 - Services

6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 65Recommended for TCD/ECD, MS, and MSD:GC Supply Gas Installation Kit 19199M

Page 104

6850 Series GC Site Preparation 66 GC, GC/MS, and ALS Site Preparation GuideYou must also provide the fittings and reducers required to convert the c

Page 105

6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 67Hydrogen Carrier GasIf planning to use hydrogen carrier gas, note that spe

Page 106 - Dimensions and Weight

6850 Series GC Site Preparation 68 GC, GC/MS, and ALS Site Preparation GuideDimensions and WeightSelect the laboratory bench space before the system

Page 107

6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 69A 6850 system that includes a GC, an ALS injector, and a computer would re

Page 108 - Power Consumption

7GC, GC/MS, and ALSSite Preparation GuideAgilent Technologies17890 Series GC Site PreparationCustomer Responsibilities 8Installation Kits 9Hydro

Page 109 - Grounding

6850 Series GC Site Preparation 70 GC, GC/MS, and ALS Site Preparation GuidePower ConsumptionTable 31 lists site power requirements.• The number and

Page 110

6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 71Although your GC should arrive ready for operation in your country, compar

Page 111

6850 Series GC Site Preparation 72 GC, GC/MS, and ALS Site Preparation GuideTo protect users, the metal instrument panels and cabinet are grounded th

Page 112 - Heat Dissipation

6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 73China 220 15 4.5 GB 1002Europe, Korea 220 / 230 / 24010 2.5 CEE/7/V11Denma

Page 113 - Exhaust Venting

6850 Series GC Site Preparation 74 GC, GC/MS, and ALS Site Preparation GuideUnited Kingdom, Hong Kong, Singapore, Malaysia240 13 2.5 BS89/13United St

Page 114 - Environmental Conditions

6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 75Heat DissipationUse Table 33 to estimate the additional BTUs of heat diss

Page 115 - Gas and Reagent Selection

6850 Series GC Site Preparation 76 GC, GC/MS, and ALS Site Preparation GuideExhaust VentingHot air (up to 350 °C) from the oven exits through a vent

Page 116 - Gas and Reagent Purity

6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 77Environmental ConditionsOperating the instrument within the recommended ra

Page 117 - Gas Supplies

6850 Series GC Site Preparation 78 GC, GC/MS, and ALS Site Preparation GuideGas SelectionTable 35 lists gases usable with Agilent GCs and capillary c

Page 118

6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 79For installation checkout, Agilent requires the gas types shown in Table 3

Page 119

7890 Series GC Site Preparation 8 GC, GC/MS, and ALS Site Preparation GuideCustomer ResponsibilitiesThe specifications in this manual outline the nec

Page 120

6850 Series GC Site Preparation 80 GC, GC/MS, and ALS Site Preparation GuideTable 3 7 Gases required for checkout Detector Gases requiredFID Carrier

Page 121 - Gas Plumbing

6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 81Gas and Reagent PurityAgilent recommends that carrier and detector gases b

Page 122

6850 Series GC Site Preparation 82 GC, GC/MS, and ALS Site Preparation GuideGas SuppliesSupply instrument gases using tanks, an internal distribution

Page 123

6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 83Conversions: 1 psi = 6.8947 kPa = 0.068947 Bar = 0.068 ATMRequirements for

Page 124 - Two-stage pressure regulators

6850 Series GC Site Preparation 84 GC, GC/MS, and ALS Site Preparation GuideGC/MS Gas RequirementsSee the appropriate tables for gas and reagent gas

Page 125 - Filters and traps

6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 85Table 44 lists typical flows resulting from selected carrier and reagent g

Page 126 - Filter types

6850 Series GC Site Preparation 86 GC, GC/MS, and ALS Site Preparation GuideGas PlumbingWARNINGAll compressed gas cylinders should be securely fasten

Page 127 - Detector Connection Diagram

6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 87• If you have not requested option 305 (pre- plumbed tubing), you must sup

Page 128

6850 Series GC Site Preparation 88 GC, GC/MS, and ALS Site Preparation GuideSupply tubing for most carrier and detector gasesUse only preconditioned

Page 129

6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 89• Do not re- use old tubing when installing or switching to hydrogen carri

Page 130 - Maximum Length of Cables

7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 9Installation KitsAgilent offers several installation kits that provide part

Page 131 - Site LAN Network

6850 Series GC Site Preparation 90 GC, GC/MS, and ALS Site Preparation GuideThe type of regulator you use depends on the gas type and supplier. The A

Page 132 - PC Requirements

6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 91filters are designed for use with the GC, GC/MS, ICP- OES, ICP- MS, LC/MS,

Page 133 - Sampler Site Preparation

6850 Series GC Site Preparation 92 GC, GC/MS, and ALS Site Preparation GuideTable 4 6 Connection diagrams for common detectors ECDElectron Capture De

Page 134

6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 93Table 47 lists the most common Gas Clean Filter system kits. See the Agile

Page 135

6850 Series GC Site Preparation 94 GC, GC/MS, and ALS Site Preparation GuideEach separate gas supply requires its own filters. See also “Basic Tools

Page 136 - Part number Description

6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 95Cryogenic Cooling RequirementsCryogenic cooling allows you to cool the ove

Page 137

6850 Series GC Site Preparation 96 GC, GC/MS, and ALS Site Preparation Guide• Use 1/8- inch diameter heavy- wall stainless steel tubing for supply tu

Page 138

6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 97Maximum Length of CablesThe distance between system modules may be limited

Page 139 - Chiller Supplies

6850 Series GC Site Preparation 98 GC, GC/MS, and ALS Site Preparation GuideSite LAN NetworkIf you intend to connect your system to your site’s LAN n

Page 140

6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 99PC RequirementsIf using an Agilent data system, refer to the data system d

Comments to this Manuals

No comments