Agilent Technologies Agilent GC, GC/MS, and ALSSite Preparation Guide
7890 Series GC Site Preparation 10 GC, GC/MS, and ALS Site Preparation GuideRecommended for TCD/ECD, MS, and MSD:GC Supply Gas Installation Kit 19199
6850 Series GC Site Preparation 100 GC, GC/MS, and ALS Site Preparation Guide
101GC, GC/MS, and ALSSite Preparation GuideAgilent Technologies37820 MSD Site PreparationCustomer Responsibilities 102Basic Tools and Consumable Su
7820 MSD Site Preparation 102 GC, GC/MS, and ALS Site Preparation GuideCustomer ResponsibilitiesThe specifications in this manual outline the necessa
7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 103Agilent Technologies Installation and Familiarization ServicesIf you purchased
7820 MSD Site Preparation 104 GC, GC/MS, and ALS Site Preparation GuideBasic Tools and Consumable SuppliesThe GC comes with a few basic tools and con
7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 105Table 50 lists consumables that you may wish to order. First time GC users shou
7820 MSD Site Preparation 106 GC, GC/MS, and ALS Site Preparation GuideDimensions and WeightSelect the laboratory bench space before the system arriv
7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 107A 7820 MSD system that includes a GC, ALS injector, 5977 or 5975 MSD and a comp
7820 MSD Site Preparation 108 GC, GC/MS, and ALS Site Preparation GuidePower ConsumptionTable 52 lists site power requirements.• The number and type
7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 109Although your GC should arrive ready for operation in your country, compare its
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 11You must also provide the fittings and reducers required to convert the cy
7820 MSD Site Preparation 110 GC, GC/MS, and ALS Site Preparation GuideThe three- conductor power line cord, when plugged into a properly grounded re
7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 111India, South Africa 240 15 4.5 AS 3112 Japan 200 20 4.5 NEMA L6-20PUnited Kingd
7820 MSD Site Preparation 112 GC, GC/MS, and ALS Site Preparation GuideHeat DissipationUse Table 54 to estimate the additional BTUs of heat dissipat
7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 113Exhaust VentingHot air (up to 425 °C) from the oven exits through a vent in the
7820 MSD Site Preparation 114 GC, GC/MS, and ALS Site Preparation GuideEnvironmental ConditionsOperating the instrument within the recommended ranges
7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 115Gas and Reagent SelectionThe 7820 MSD system (GC and MSD) requires helium or hy
7820 MSD Site Preparation 116 GC, GC/MS, and ALS Site Preparation GuideGas and Reagent PurityAgilent recommends that carrier and detector gases be 99
7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 117Gas SuppliesGeneral requirementsSupply instrument gases using tanks, an interna
7820 MSD Site Preparation 118 GC, GC/MS, and ALS Site Preparation GuideConversions: 1 psi = 6.8947 kPa = 0.068947 Bar = 0.068 ATMRequirements for hyd
7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 119GC/MS Gas and Reagent RequirementsSee the appropriate tables for gas and reagen
7890 Series GC Site Preparation 12 GC, GC/MS, and ALS Site Preparation GuideHydrogen Carrier GasIf planning to use hydrogen carrier gas, note that sp
7820 MSD Site Preparation 120 GC, GC/MS, and ALS Site Preparation GuideTable 62 lists typical flows resulting from selected carrier and reagent gas s
7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 121Gas PlumbingWARNINGAll compressed gas cylinders should be securely fastened to
7820 MSD Site Preparation 122 GC, GC/MS, and ALS Site Preparation Guide• If you have not requested option 305 (pre- plumbed tubing), you must supply
7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 123Supply tubing for most carrier and detector gasesUse only preconditioned copper
7820 MSD Site Preparation 124 GC, GC/MS, and ALS Site Preparation Guide• Do not re- use old tubing when installing or switching to hydrogen carrier g
7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 125The type of regulator you use depends on the gas type and supplier. The Agilent
7820 MSD Site Preparation 126 GC, GC/MS, and ALS Site Preparation Guidefilters are designed for use with the GC, GC/MS, ICP- OES, ICP- MS, LC/MS, and
7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 127Table 6 4 Connection diagrams for common detectors ECDElectron Capture Detector
7820 MSD Site Preparation 128 GC, GC/MS, and ALS Site Preparation GuideTable 65 lists the most common Gas Clean Filter system kits. See the Agilent o
7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 129Each separate gas supply requires its own filters. Table 6 5 Recommended Gas Cl
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 13Dimensions and WeightSelect the laboratory bench space before the system a
7820 MSD Site Preparation 130 GC, GC/MS, and ALS Site Preparation GuideMaximum Length of CablesThe distance between system modules may be limited by
7820 MSD Site Preparation GC, GC/MS, and ALS Site Preparation Guide 131Site LAN NetworkIf you intend to connect your system to your site’s LAN network
7820 MSD Site Preparation 132 GC, GC/MS, and ALS Site Preparation GuidePC RequirementsAny 7820 GC/MSD system requires Agilent control software. For P
133GC, GC/MS, and ALSSite Preparation GuideAgilent Technologies47693A and 7650 Automatic Liquid Sampler Site PreparationCustomer Responsibilities 1
7693A and 7650 Automatic Liquid Sampler Site Preparation 134 GC, GC/MS, and ALS Site Preparation GuideCustomer ResponsibilitiesThe specifications in
7693A and 7650 Automatic Liquid Sampler Site Preparation GC, GC/MS, and ALS Site Preparation Guide 135Basic Tools and Consumable SuppliesThe 7693A and
7693A and 7650 Automatic Liquid Sampler Site Preparation 136 GC, GC/MS, and ALS Site Preparation GuideVial racks (7693A)9301-0722 Rack for 12 mm, 2 m
7693A and 7650 Automatic Liquid Sampler Site Preparation GC, GC/MS, and ALS Site Preparation Guide 137Dimensions and WeightSelect the laboratory bench
7693A and 7650 Automatic Liquid Sampler Site Preparation 138 GC, GC/MS, and ALS Site Preparation GuidePower ConsumptionThe ALS components draw power
7693A and 7650 Automatic Liquid Sampler Site Preparation GC, GC/MS, and ALS Site Preparation Guide 139Chiller SuppliesIf using the optional G4522A Coo
7890 Series GC Site Preparation 14 GC, GC/MS, and ALS Site Preparation Guide• Performance turbo pump 41 cm (16 in) 30 cm (12 in) 54 cm (22 in) 41 kg
7693A and 7650 Automatic Liquid Sampler Site Preparation 140 GC, GC/MS, and ALS Site Preparation Guide
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 15A system that includes a 7890 Series GC, a 5977, 5975 or 7000 MS, an ALS,
7890 Series GC Site Preparation 16 GC, GC/MS, and ALS Site Preparation GuideFigure 1 Front view of example installation, 7890B GC/5977 MSD system wit
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 17A 7890 Series system that includes a GC, a Q- TOF MS, an ALS, and a comput
7890 Series GC Site Preparation 18 GC, GC/MS, and ALS Site Preparation Guide(1 ft) of space behind the instrument for air circulation, the vacuum pum
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 19If using an ion trap MS:The vacuum hose connecting the Ion Trap MS to the
2 GC, GC/MS, and ALS Site Preparation GuideNotices© Agilent Technologies, Inc. 2013No part of this manual may be reproduced in any form or by any mean
7890 Series GC Site Preparation 20 GC, GC/MS, and ALS Site Preparation GuidePower ConsumptionTable 3 lists site power requirements.• The number and t
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 21220/240 Ion Trap MS200 (+/–10%)50/60 ± 5% 1500 6 10 Amp Dedicated220/240 I
7890 Series GC Site Preparation 22 GC, GC/MS, and ALS Site Preparation GuideAlthough your GC should arrive ready for operation in your country, compa
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 23USA fast heating oven, 240 VThe 240 V fast heating oven requires 240 V/15
7890 Series GC Site Preparation 24 GC, GC/MS, and ALS Site Preparation GuideEurope, Korea 220 / 230 / 24010 2.5 CEE/7/V11Denmark, Switzerland 230 16
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 25United States 120 20, 12 AWG 4.5 NEMA 5-20PUnited States 240 15, 14 AWG 2.
7890 Series GC Site Preparation 26 GC, GC/MS, and ALS Site Preparation GuideHeat DissipationUse Table 5 to estimate the additional BTUs of heat diss
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 27Exhaust VentingHot air (up to 450 °C) from the oven exits through a vent i
7890 Series GC Site Preparation 28 GC, GC/MS, and ALS Site Preparation GuideFigure 4 Exhaust deflector G1530-80650During normal operation of the GC w
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 29Environmental ConditionsOperating the instrument within the recommended ra
GC, GC/MS, and ALS Site Preparation Guide 3Contents1 7890 Series GC Site PreparationCustomer Responsibilities 8Installation Kits 9Hydrogen C
7890 Series GC Site Preparation 30 GC, GC/MS, and ALS Site Preparation GuideMS7000 Triple Quad MS Operation 15 to 35 °C † (59 to 95 °F)40 to 80% 5,00
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 31Gas and Reagent SelectionTable 7 lists gases usable with Agilent GCs and c
7890 Series GC Site Preparation 32 GC, GC/MS, and ALS Site Preparation GuideTable 8 lists gas recommendations for packed column use. In general, make
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 33Table 9 Gases and reagents required for checkout Detector Gases requiredFI
7890 Series GC Site Preparation 34 GC, GC/MS, and ALS Site Preparation GuideGas and Reagent PurityAgilent recommends that carrier and detector gases
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 35Gas SuppliesGeneral requirementsSupply instrument gases using tanks, an in
7890 Series GC Site Preparation 36 GC, GC/MS, and ALS Site Preparation GuideThe minimum supply pressure for Auxiliary EPC and PCM modules is 138 kPa
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 37Requirements for hydrogen as a carrier gasNot all systems can use hydrogen
7890 Series GC Site Preparation 38 GC, GC/MS, and ALS Site Preparation GuideGC/MS Gas and Reagent RequirementsSee the appropriate tables for gas and
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 39Table 17 lists the limits on total gas flow into the 5977 Series MSD. Maxi
4 GC, GC/MS, and ALS Site Preparation GuideMaximum Length of Cables and Hoses 56Site LAN Network 57PC Requirements 582 6850 Series GC
7890 Series GC Site Preparation 40 GC, GC/MS, and ALS Site Preparation GuideTable 18 lists typical flows resulting from selected carrier and reagent
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 41Table 20 lists typical flows resulting from selected carrier and reagent g
7890 Series GC Site Preparation 42 GC, GC/MS, and ALS Site Preparation GuideTable 22 lists typical flows resulting from selected carrier and reagent
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 43Gas PlumbingWARNINGAll compressed gas cylinders should be securely fastene
7890 Series GC Site Preparation 44 GC, GC/MS, and ALS Site Preparation Guide• If you have not requested option 305 (pre- plumbed tubing), you must su
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 45Supply tubing for most carrier and detector gasesUse only preconditioned c
7890 Series GC Site Preparation 46 GC, GC/MS, and ALS Site Preparation Guide• Do not re- use old tubing when installing or switching to hydrogen carr
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 47The type of regulator you use depends on the gas type and supplier. The Ag
7890 Series GC Site Preparation 48 GC, GC/MS, and ALS Site Preparation Guidefilters are designed for use with the GC, GC/MS, ICP- OES, ICP- MS, LC/MS
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 49Table 2 4 Connection diagrams for common detectors ECDElectron Capture Det
GC, GC/MS, and ALS Site Preparation Guide 5Site LAN Network 98PC Requirements 993 7820 MSD Site PreparationCustomer Responsibilities 1
7890 Series GC Site Preparation 50 GC, GC/MS, and ALS Site Preparation GuideTable 25 lists the most common Gas Clean Filter system kits. See the Agil
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 51Each separate gas supply requires its own filters. See also “Installation
7890 Series GC Site Preparation 52 GC, GC/MS, and ALS Site Preparation GuideCryogenic Cooling RequirementsCryogenic cooling allows you to cool the ov
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 53Additional requirements for the liquid CO2 system include:• The tank must
7890 Series GC Site Preparation 54 GC, GC/MS, and ALS Site Preparation GuideUsing liquid nitrogenLiquid nitrogen is supplied in insulated Dewar tanks
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 55Using compressed airThe multimode inlet can also use compressed air coolin
7890 Series GC Site Preparation 56 GC, GC/MS, and ALS Site Preparation GuideMaximum Length of Cables and HosesThe distance between system modules may
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 57Site LAN NetworkIf you intend to connect your system to your site’s LAN ne
7890 Series GC Site Preparation 58 GC, GC/MS, and ALS Site Preparation GuidePC RequirementsIf using an Agilent data system, refer to the data system
59GC, GC/MS, and ALSSite Preparation GuideAgilent Technologies26850 Series GC Site PreparationCustomer Responsibilities 60Basic Tools and Installat
6 GC, GC/MS, and ALS Site Preparation Guide4 7693A and 7650 Automatic Liquid Sampler Site PreparationCustomer Responsibilities 134Basic Tools an
6850 Series GC Site Preparation 60 GC, GC/MS, and ALS Site Preparation GuideCustomer ResponsibilitiesThe specifications in this manual outline the ne
6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 61Basic Tools and Installation KitsThe GC/MS comes with a few basic tools an
6850 Series GC Site Preparation 62 GC, GC/MS, and ALS Site Preparation GuideTable 28 lists consumables that you may wish to order. First time GC user
6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 63Agilent offers several installation kits that provide parts useful during
6850 Series GC Site Preparation 64 GC, GC/MS, and ALS Site Preparation GuideTable 2 9 Installation kits Kit Part number Kit contentsRecommended for F
6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 65Recommended for TCD/ECD, MS, and MSD:GC Supply Gas Installation Kit 19199M
6850 Series GC Site Preparation 66 GC, GC/MS, and ALS Site Preparation GuideYou must also provide the fittings and reducers required to convert the c
6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 67Hydrogen Carrier GasIf planning to use hydrogen carrier gas, note that spe
6850 Series GC Site Preparation 68 GC, GC/MS, and ALS Site Preparation GuideDimensions and WeightSelect the laboratory bench space before the system
6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 69A 6850 system that includes a GC, an ALS injector, and a computer would re
7GC, GC/MS, and ALSSite Preparation GuideAgilent Technologies17890 Series GC Site PreparationCustomer Responsibilities 8Installation Kits 9Hydro
6850 Series GC Site Preparation 70 GC, GC/MS, and ALS Site Preparation GuidePower ConsumptionTable 31 lists site power requirements.• The number and
6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 71Although your GC should arrive ready for operation in your country, compar
6850 Series GC Site Preparation 72 GC, GC/MS, and ALS Site Preparation GuideTo protect users, the metal instrument panels and cabinet are grounded th
6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 73China 220 15 4.5 GB 1002Europe, Korea 220 / 230 / 24010 2.5 CEE/7/V11Denma
6850 Series GC Site Preparation 74 GC, GC/MS, and ALS Site Preparation GuideUnited Kingdom, Hong Kong, Singapore, Malaysia240 13 2.5 BS89/13United St
6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 75Heat DissipationUse Table 33 to estimate the additional BTUs of heat diss
6850 Series GC Site Preparation 76 GC, GC/MS, and ALS Site Preparation GuideExhaust VentingHot air (up to 350 °C) from the oven exits through a vent
6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 77Environmental ConditionsOperating the instrument within the recommended ra
6850 Series GC Site Preparation 78 GC, GC/MS, and ALS Site Preparation GuideGas SelectionTable 35 lists gases usable with Agilent GCs and capillary c
6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 79For installation checkout, Agilent requires the gas types shown in Table 3
7890 Series GC Site Preparation 8 GC, GC/MS, and ALS Site Preparation GuideCustomer ResponsibilitiesThe specifications in this manual outline the nec
6850 Series GC Site Preparation 80 GC, GC/MS, and ALS Site Preparation GuideTable 3 7 Gases required for checkout Detector Gases requiredFID Carrier
6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 81Gas and Reagent PurityAgilent recommends that carrier and detector gases b
6850 Series GC Site Preparation 82 GC, GC/MS, and ALS Site Preparation GuideGas SuppliesSupply instrument gases using tanks, an internal distribution
6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 83Conversions: 1 psi = 6.8947 kPa = 0.068947 Bar = 0.068 ATMRequirements for
6850 Series GC Site Preparation 84 GC, GC/MS, and ALS Site Preparation GuideGC/MS Gas RequirementsSee the appropriate tables for gas and reagent gas
6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 85Table 44 lists typical flows resulting from selected carrier and reagent g
6850 Series GC Site Preparation 86 GC, GC/MS, and ALS Site Preparation GuideGas PlumbingWARNINGAll compressed gas cylinders should be securely fasten
6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 87• If you have not requested option 305 (pre- plumbed tubing), you must sup
6850 Series GC Site Preparation 88 GC, GC/MS, and ALS Site Preparation GuideSupply tubing for most carrier and detector gasesUse only preconditioned
6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 89• Do not re- use old tubing when installing or switching to hydrogen carri
7890 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 9Installation KitsAgilent offers several installation kits that provide part
6850 Series GC Site Preparation 90 GC, GC/MS, and ALS Site Preparation GuideThe type of regulator you use depends on the gas type and supplier. The A
6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 91filters are designed for use with the GC, GC/MS, ICP- OES, ICP- MS, LC/MS,
6850 Series GC Site Preparation 92 GC, GC/MS, and ALS Site Preparation GuideTable 4 6 Connection diagrams for common detectors ECDElectron Capture De
6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 93Table 47 lists the most common Gas Clean Filter system kits. See the Agile
6850 Series GC Site Preparation 94 GC, GC/MS, and ALS Site Preparation GuideEach separate gas supply requires its own filters. See also “Basic Tools
6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 95Cryogenic Cooling RequirementsCryogenic cooling allows you to cool the ove
6850 Series GC Site Preparation 96 GC, GC/MS, and ALS Site Preparation Guide• Use 1/8- inch diameter heavy- wall stainless steel tubing for supply tu
6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 97Maximum Length of CablesThe distance between system modules may be limited
6850 Series GC Site Preparation 98 GC, GC/MS, and ALS Site Preparation GuideSite LAN NetworkIf you intend to connect your system to your site’s LAN n
6850 Series GC Site Preparation GC, GC/MS, and ALS Site Preparation Guide 99PC RequirementsIf using an Agilent data system, refer to the data system d
Comments to this Manuals