Carrier 42PQV...S Installation Manual

Browse online or download Installation Manual for Heat pumps Carrier 42PQV...S. Carrier 42PQV...S Installation manual User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 14
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
38VYX050/38VYX080
L
L
O
Y
D
'
S
R
E
G
I
S
T
E
R
Q
U
A
L
I
T
Y
A
S
S
U
R
A
N
C
E
I
S
O
9
0
0
1
INSTALLATION MANUAL
Page view 0
1 2 3 4 5 6 ... 13 14

Summary of Contents

Page 1 - 38VYX050/38VYX080

38VYX050/38VYX080•LLOYD'SREGISTERQUALITYASSURANCEISO9001INSTALLATION MANUAL

Page 2

GB - 938VYX050/38VYX080 ENGLISHEvacuating- This air conditioner can be installed up to the connecting pipe length and height difference in the followi

Page 3

38VYX050/38VYX080 GB - 10All field electrical connections are the responsibility of theinstaller.WARNING:• Wrong wiring may cause a burn-out to some e

Page 4

GB - 1138VYX050/38VYX080 ENGLISHFinal installation checksCheck and Test OperationFor R410A, use the leak detector exclusively manufactured for HFCrefr

Page 5

38VYX050/38VYX080 GB - 12Final installation checksInstallation/Servicing ToolsChanges in the product and componentsIn the case of an air conditioner u

Page 6

38VYX 050-080Via R. Sanzio, 9 - 20058 Villasanta (MI) Italy - Tel. 039/3636.1The manufacturer reserves the right to change any product specifications

Page 7

38VYX050/38VYX080 Heat pump split system outdoor unitsGB - 1ENGLISHFor operation and maintenance instructions of this unit as well as installationinst

Page 8

GB - 238VYX050/38VYX080 General informationPrecautions for safetyThe unit must be installed according to the national plant-engineering standards.• Re

Page 9

GB - 338VYX050/38VYX080 ENGLISHAccessory and refrigerantTable II: Accessory and Installation PartsRefrigerant Piping• Piping kit used for the conventi

Page 10

GB - 438VYX050/38VYX080 Knockout procedure• The indoor/outdoor connecting pipes can be connected to 4directions. Take off the knockout part of the pip

Page 11

GB - 538VYX050/38VYX080 ENGLISH38 VYX 050Pipe forming / positioning• Pipe forming.Form the pipe along with a marked line of the cabinet.• End position

Page 12

38VYX050/38VYX080 GB - 6Minimum clearancesSingle unit installation Obstacles at both right and left sides.Serial installation of two or more unitsSing

Page 13

GB - 738VYX050/38VYX080 ENGLISHMinimum clearancesOpen the upper side and both right and left sides.The height of obstacle at both front and rear side,

Page 14 - 38VYX 050-080

GB - 838VYX050/38VYX080 • When there is a possibility of freezing of drain at the cold districtor a snowfall area, be careful for drainage ability of

Comments to this Manuals

No comments