Carrier 58DH User Manual Page 2

  • Download
  • Add to my manuals
  • Print
  • Page
    / 10
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 1
S
-H THERMOSTAT „„
WIRE ENTRY 13..
-4"
-2l
llll
H
F"
1
o
.. f
__
j
r
__
Ì
1" 7“
“'2
S POWER
ENTRY
l^DIA KO.
RH.GAS
ENTRY
M
► ---i"
=^ORI
BOLTS (BOTH SIDES)
Fig. 3 — Dimensional Drawing (in.)
Installation Procedures
Page
Inspection
........................................................
*
**
Location, Ventilation and Air for
Combustion
.....................................................
*
Gas Piping
...........................................................
*
Venting ................................................................ *
Supply-Air Plenum Installation
(downflow) ...................................................... 3
Page
Horizontal Attic Installation...................................4
Crawl Space Installation
.......................................
5
Filter Arrangement ............................................... 5
Electrical Connections
.........................................
5
Sequence of Operation
.........................................
V
Start-Up and Adjustment
......................................
8
Care and Maintenance ...........................................8
‘Refer to appropriate sections of ProcSdures for Induced-Draft Gas-Fired Furnaces booklet packed with this furnace.
Table 1 — Clearances (in.)^
FURNACE
TOP
SIDESt
BACK
FRONT VENT
DOWNFLOW (In Alcove or Closet)|
Single-Wall Vent 1
1
0
6»*
6
Type B1 Double-Wall Vent
1
0 0
3»*
1
HORIZONTAL (In Alcove)ft
Single-Wall Vent 1
Iti
0 18
6
Type B1 Double-Wall Vent 0
lit
0 18
1
HORIZONTAL (In Closet)
Single-Wall Vent 2
nt
3 6
6
Type B1 Double-Wall Vent 2
nt
3 3
1
HORIZONTAL (Attic or Unoccupied Spaces)
Type B1 or Type L Double-Wall Vent
1
ut
0 18
1
*Provide a 30-in. service clearance in front of
the furnace.
flndicates supply or return sides \A/hen furnace
is in the horizontal position.
íFor installation on non-combustiblefloorsonly.
For installation on combustible flooring only
when installed on special base (Part No.
58DS900041).
**Alcove installations require 18-in. front
clearance.
ttLine contact permissible only between lines
formed by intersections of the top and 2 sides
of the furnace jacket, and building joists, studs
or framing.
ifClearance shown is for the outlet side. The inlet
side must maintain 6-in. clearance from flue
to combustible materials with single-wall vent.
Table 2 — Dimensions (in.)
Furnace
Size
A
B
C
Vent
Diam
035,040
14-3/16
12-9/16
12-11/16 4
055,060
14-3/16
12-9/16 12-11/16 4
070,080
17-1/2
15-7/8 16
4
090,1 OO(CC) 17-1/2
15-7/8 16i 4
090,1 OO(DC) 21
19-3/8 19-1/2 4
110,120 24-1 /2
22-13/16 23 5
NOI I \Mn.i' l)4().i)SS ,|iul iibli size )m-
n.iccN .ih. iiiM.iILd in d hoii/iMiul poMiion on
conibiixliblc ni,iîi.iial 11 IS iictcss.ii\ lo i.iisciIil
I LI I IKK I. OIK in lo ohi.iin icqiiiicd (<-in \Liiipipc
lIc.LI.1IKl tOI
.1
Mllglc V^dll Lent
The Carrier induced-draft gas furnace is designed
to accept a Carrier electronic air cleaner and
humidifier.
For accessory installation details, refer to appli
cable installation literature.
Page view 1
1 2 3 4 5 6 7 8 9 10

Comments to this Manuals

No comments