Carrier 19XL Specifications Page 28

  • Download
  • Add to my manuals
  • Print
  • Page
    / 80
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 27
Install Vent Piping to Relief Devices
The 19XL chiller is factory equipped with relief devices on the cooler and condenser shells.
Refer to Figure 21 and Table 6 for size and location of relief devices. Vent relief devices to the
outdoors in accordance with ANSI/ASHRAE 15 (latest edition) Safety Code for Mechanical
Refrigeration and all other applicable codes.
1.
If relief devices are manifolded, the cross-sectional area of the relief pipe must at least
equal the sum of the areas required for individual relief pipes.
2.
Provide a pipe plug near outlet side of each relief device for leak testing. Provide pipe
fittings that allow vent piping to be disconnected periodically for inspection of valve
mechanism.
3.
Piping to relief devices must not apply stress to the device. Adequately support piping. A
Figure 20 — Pumpout Unit
Refrigerant discharged into confined spaces can displace oxygen and cause
asphyxiation.
DANGER
!
DANGER
Page view 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 79 80

Comments to this Manuals

No comments