Carrier 25VNA8 Instruction Manual

Browse online or download Instruction Manual for Heat pumps Carrier 25VNA8. Carrier 25VNA8 Instruction manual User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 22
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Installation Instructions
25VNA8
Infinityr 18VS Variable Speed Heat Pump
with Puronr Refrigerant
NOTE: Read the entire instruction manual before starting the installation.
TABLE OF CONTENTS
PAGE NO.
SAFETY CONSIDERATIONS 2......................................................................
INSTALLATION RECOMMENDATIONS 2............................................................
INSTALLATION 3..................................................................................
Step 1 Check Equipment and Job site 3..........................................................
Step 2 Install on Solid, Level Mounting Pad 3....................................................
Step 3 Clearance Requirements 4...............................................................
Step 4 Operating Ambient 4..................................................................
Step 5 Elevate Unit 4........................................................................
Step 6 Making Piping Connections 4............................................................
Step 7 Make Electrical Connections 4...........................................................
Step 8 Compressor Internal Crankcase Heater 8...................................................
Step 9 Install Accessories 8...................................................................
Step 10 Start-- Up 8..........................................................................
Step 11 System Functions and Sequence of Operation 9.............................................
Step 12 Check Charge 11......................................................................
Step 13 Pumpdown & Evacuation 14.............................................................
MAJOR COMPONENTS 15...........................................................................
TROUBLESHOOTING 16.............................................................................
FINAL CHECKS 21..................................................................................
CARE AND MAINTENANCE 21.......................................................................
PURONr REFRIGERANT QUICK REFERENCE GUIDE 21...............................................
Page view 0
1 2 3 4 5 6 ... 21 22

Summary of Contents

Page 1 - Installation Instructions

Installation Instructions25VNA8Infinityr 18VS Variable Speed Heat Pumpwith Puronr RefrigerantNOTE: Read the entire instruction manual before starting

Page 2 - INSTALLATION RECOMMENDATIONS

10A14021Fig. 12 -- AOC Control BoardCrankcase Heater OperationThis unit has an internal crankcase heater that will be energizedduring the of f cycle a

Page 3 - INSTALLATION

11The control board accumulates compressor run time. As theaccumulated run time approaches the selected defrost interval time,the control board monito

Page 4 - Step 5 — Elevate Unit

12Table 3 – Required Charge Adjustment for Indoor Coil ModelF urnace or Fan Coil ModelNumber25VNA824A003 25VNA825A003 25VNA836A003 25VNA848A003CNPV*36

Page 5

13Heating Check Chart Procedur e (See Fig.16 -- 18)(Communicating / Non--communicating Systems)In heating mode, the required charging method is by wei

Page 6 - RYOWCHUM

14Step 13 — Pumpdown & EvacuationCAUTION!ENVIRONMENTAL HAZARDFailure to follow this caution may result in environmentaldamage.Federal regulations

Page 7 - (furnace)

15MAJOR COMPONENTSVariable speed Control BoardA13361Fig. 19 -- AOC (Application Operational Control) BoardThe AOC board is located in the lower right

Page 8

16TROUBLESHOOTINGSystems Communication FailureIf communication is lost with the User Interface (UI), the controlwill flash the appropriate fault code

Page 9 - Operation

17Refer to Table 5 and Fig. 21 and 22 for resistance values versustemperature.Table 5 – 10K/50Kohm Resistance Values vs Temperature10Kohm_C(_F)TEMPERA

Page 10 - Defr ost

18Suction Thermistor (OST)Suction Thermistor is used for assisting in EXV control and mustbe secured on the suction tube and aligned longitudinally to

Page 11 - Step 12 — Check Charge

19Status CodesTable 7 shows the status codes flashed by the amber status light.Most system problems can be diagnosed by reading the status codeas flas

Page 12 - SUBCOOLING TEMPERATURE º C

2Information in these installation instructions pertains only to25VNA8 series units.SAFETY CONSI DERATIONSImproper installation, adjustment, alteratio

Page 13 - ±0.6 oz./ft

20Table 7 – TroubleshootingOutdoor Fan Dropped Out66 6Stator Heater Fault67666Fan Inverter Over Current63 6Fan Inverter Lockout762 HoursCompressor/Inv

Page 14

21FINAL CHECKSIMPORTANT: Before leaving job, be sure to do thefollowing:1. Ensure that all wiring is routed away from tubingand sheet metal edges to p

Page 15 - MAJOR COMPONENTS

22Copyright 2014 Carrier Corp. S 7310 W. Morris St. S India napolis, IN 46231 Edition Date: 05/14Manufacturer reserves the right to change, at any tim

Page 16 - TROUBLESHOOTING

37. Avoid direct tubing contact with water pipes, duct work,floor joists, wall studs, floors, and walls.8. Do not suspend refrigerant tubing from jois

Page 17 - 50K THERMISTOR

4Step 3 — Clearance RequirementsWhen installing, allow suf ficient space for airflow clearance,wiring, refrigerant piping, and service. Allow 24 in. (

Page 18 - Fan Motor

5Outdoor Unit Connected to Factory--Approved IndoorUnitOutdoor unit contains correct system refrigerant charge foroperation with factory-- approved, A

Page 19 - Utility Relay

6Step 7 — Make Electrical Connections!WARNINGELECTRICAL SHOCK HAZARDFailure to follow this warning could result in personalinjury or death.Do not supp

Page 20 - AMBER LED DESCRIPTION

7OORVS Cooling O/B W2 W1 W1Heat Stage 3 W/W1 W2Heat/Cool Stage 1 Y1 / W2 Y1 Y1Heat/Cool Stage 2 Y/Y2 Y/Y2 Y2Fan G G24VAC Hot Heating Rh R24VAC Hot Coo

Page 21 - CARE AND MAINTENANCE

8Step 8 — Compressor Crankcase HeaterThis compressor has an internal crankcase heater. Furnish powerto the unit a minimum of 24 hr before starting the

Page 22 - Catalog No: 25VNA8---2SI

9Follow these steps to properly start up the system:1. After system is evacuated, close the disconnects to energizethe ID and OD units to access the u

Comments to this Manuals

No comments