Carrier 19XRV Specifications Page 3

  • Download
  • Add to my manuals
  • Print
  • Page
    / 206
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 2
3
CONTENTS (cont)
Page
Safety Shutdown . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
BEFORE INITIAL START-UP . . . . . . . . . . . . . . . . . . 65-88
Job Data Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
Equipment Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
Using the Optional Storage Tank
and Pumpout System . . . . . . . . . . . . . . . . . . . . . . . . . 65
Remove Shipping Packaging . . . . . . . . . . . . . . . . . . . . 65
Open Oil Circuit Valves. . . . . . . . . . . . . . . . . . . . . . . . . . 65
Tighten All Gasketed Joints and
Guide Vane Shaft Packing. . . . . . . . . . . . . . . . . . . . . 65
Check Chiller Tightness . . . . . . . . . . . . . . . . . . . . . . . . . 65
Refrigerant Tracer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
Leak Test Chiller . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
Standing Vacuum Test . . . . . . . . . . . . . . . . . . . . . . . . . . 69
Chiller Dehydration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
Inspect Water Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
Check Optional Pumpout Compressor
Water Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
Check Relief Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
Inspect Wiring. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70
Carrier Comfort Network
®
Interface . . . . . . . . . . . . . 70
Check Starter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70
MECHANICAL STARTER
BENSHAW, INC. RediStart MX3™
SOLID-STATE STARTER
VFD STARTER
Oil Charge. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71
Power Up the Controls and
Check the Oil Heater . . . . . . . . . . . . . . . . . . . . . . . . . . 71
SOFTWARE VERSION
Software Configuration . . . . . . . . . . . . . . . . . . . . . . . . . 71
Input the Design Set Points . . . . . . . . . . . . . . . . . . . . . 71
Input the Local Occupied Schedule
(OCCPC01S) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71
Input Service Configurations. . . . . . . . . . . . . . . . . . . . 72
PASSWORD
INPUT TIME AND DATE
CHANGE ICVC CONFIGURATION
IF NECESSARY
TO CHANGE THE PASSWORD
TO CHANGE THE ICVC DISPLAY FROM
ENGLISH TO METRIC UNITS
CHANGE LANGUAGE (ICVC Only)
MODIFY CONTROLLER IDENTIFICATION
IF NECESSARY
INPUT EQUIPMENT SERVICE PARAMETERS
IF NECESSARY
CHANGE THE BENSHAW, INC., RediStart
MX3 SOFTWARE CONFIGURATION
IF NECESSARY
VFD Field Set Up and Verification . . . . . . . . . . . . . . . 74
USING THE KEYPAD
MONITOR MODE (Default Mode)
PROGRAM MODE
ACCESSING PASSWORD PROTECTED
PARAMETERS
LABEL LOCATIONS
DRIVE PROTECTION AND OTHER INCOMING
WIRING
VFD CONTROL VERIFICATION (Non-Running)
VFD CONTROL VERIFICATION (Running)
MODIFY SURGE LINE CONFIGURATION POINTS
IF NECESSARY
HAND CALCULATE VARIABLE PRIMARY FLOW
(VPF) SURGE PREVENTION CONFIGURATIONS
CONFIGURE DIFFUSER CONTROL IF
NECESSARY
MODIFY EQUIPMENT CONFIGURATION
IF NECESSARY
Page
Perform a Control Test . . . . . . . . . . . . . . . . . . . . . . . . . . 82
GUIDE VANE CALIBRATION
COOLER AND CONDENSER PRESSURE TRANS-
DUCER AND WATERSIDE FLOW DEVICE CALI-
BRATION
Check Optional Pumpout System
Controls and Compressor. . . . . . . . . . . . . . . . . . . . . 84
High Altitude Locations . . . . . . . . . . . . . . . . . . . . . . . . . 84
Charge Refrigerant Into Chiller . . . . . . . . . . . . . . . . . . 84
CHILLER EQUALIZATION WITHOUT A
PUMPOUT UNIT
CHILLER EQUALIZATION WITH
PUMPOUT UNIT
TRIMMING REFRIGERANT CHARGE
INITIAL START-UP. . . . . . . . . . . . . . . . . . . . . . . . . . . . .88,89
Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88
Dry Run to Test Start-Up Sequence . . . . . . . . . . . . . 88
Check Motor Rotation . . . . . . . . . . . . . . . . . . . . . . . . . . . 88
Check Oil Pressure and Compressor Stop . . . . . . 88
To Prevent Accidental Start-Up. . . . . . . . . . . . . . . . . . 89
Check Chiller Operating Condition . . . . . . . . . . . . . . 89
Instruct the Customer Operator . . . . . . . . . . . . . . . . . 89
COOLER-CONDENSER
OPTIONAL PUMPOUT STORAGE TANK AND
PUMPOUT SYSTEM
MOTOR COMPRESSOR ASSEMBLY
MOTOR COMPRESSOR LUBRICATION
SYSTEM
CONTROL SYSTEM
•AUXILIARY EQUIPMENT
DESCRIBE CHILLER CYCLES
REVIEW MAINTENANCE
SAFETY DEVICES AND PROCEDURES
CHECK OPERATOR KNOWLEDGE
REVIEW THE START-UP, OPERATION, AND
MAINTENANCE MANUAL
OPERATING INSTRUCTIONS . . . . . . . . . . . . . . . . . .89,90
Operator Duties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89
Prepare the Chiller for Start-Up . . . . . . . . . . . . . . . . . 89
To Start the Chiller . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89
Check the Running System . . . . . . . . . . . . . . . . . . . . . 89
To Stop the Chiller . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90
After Limited Shutdown . . . . . . . . . . . . . . . . . . . . . . . . . 90
Preparation for Extended Shutdown . . . . . . . . . . . . 90
After Extended Shutdown . . . . . . . . . . . . . . . . . . . . . . . 90
Cold Weather Operation. . . . . . . . . . . . . . . . . . . . . . . . . 90
Manual Guide Vane Operation. . . . . . . . . . . . . . . . . . . 90
Refrigeration Log . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90
PUMPOUT AND REFRIGERANT TRANSFER
PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90-95
Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90
Operating the Optional Pumpout Unit . . . . . . . . . . . 92
TO READ REFRIGERANT PRESSURES
POSITIVE PRESSURE CHILLERS WITH STORAGE
TANKS
CHILLERS WITH ISOLATION VALVES
DISTILLING THE REFRIGERANT
GENERAL MAINTENANCE . . . . . . . . . . . . . . . . . . . .95,96
Refrigerant Properties . . . . . . . . . . . . . . . . . . . . . . . . . . 95
Adding Refrigerant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95
Removing Refrigerant. . . . . . . . . . . . . . . . . . . . . . . . . . . 95
Adjusting the Refrigerant Charge . . . . . . . . . . . . . . . 95
Refrigerant Leak Testing . . . . . . . . . . . . . . . . . . . . . . . . 95
Leak Rate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95
Test After Service, Repair, or Major Leak . . . . . . . . 95
TESTING WITH REFRIGERANT TRACER
TESTING WITHOUT REFRIGERANT TRACER
TO PRESSURIZE WITH DRY NITROGEN
Page view 2
1 2 3 4 5 6 7 8 ... 205 206

Comments to this Manuals

No comments