Carrier 50HCQA Installation Manual Page 69

  • Download
  • Add to my manuals
  • Print
  • Page
    / 104
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 68
69
Table 25 Central Terminal Board (CTB) Connections
CONNECTION
LABEL
PIN NUMBER POINT DESCRIPTION 24Vac FROM 24Vac TO
DDC
T’STAT
7 Compressor 1 Call MBB ECON
6 Compressor 2 Call MBB ECON
5 Heat Stage 1 Call MBB CONTL BOARD
4 Heat Stage 2 Call MBB CONTL BOARD
ECON
1,2 Comp 1 Call jumper DDC T’STA T CLO1/COMP1
3,4 Comp 2 Call jumper DDC T’STA T CLO2/COMP2
CLO1/
COMP1
3 Comp 1 Contactor Common CTB C C1 --- Coil
4,5 Comp 1 Jumper ECON CIRCUIT 1 LPS
6 Comp 1 Contactor Signal CIRCUIT 1 HPS C1 --- Coil
CLO2/
COMP2
3 Comp 2 Contactor Common CTB C C1 --- Coil
4,5 Comp 2 Jumper ECON CIRCUIT 2 LPS
6 Comp 2 Contactor Signal CIRCUIT 2 HPS C1 --- Coil
7 ODF Contactor Signal ECON OFC1 --- Coil
CIRCUIT 1
HPS Comp 1 High Pressure Switch CIRCUIT 1 LPS CLO1/COMP1
LPS Comp 1 jumper CLO1/COMP1 CIRCUIT 1 HPS
CIRCUIT 2
HPS Comp 2 High Pressure Switch CIRCUIT 2 LPS CLO2/COMP2
LPS Comp 2 jumper CLO2/COMP2 CIRCUIT 2 HPS
CONTRL
BOARD
2 Heat Stage 2 Call DDC T’STA T Gas Valve or PL3
3 Heat Stage 1 Call DDC T’STA T I G C --- W o r P L 3
4 IGC C ommon/Ground CTB C IGC C
5 Transformer 1 Common/Ground TRAN1 Common CTB C
6 IGC Call for Indoor fan IGC IFO CONTL BOARD
7 IGC Call for Indoor fan CONTL BOARD MBB
8 IGC power (T1J9) CTB R IGC R
9 Transformer1Power(T1J1) TRAN1 24Vac UNIT SHUTDOWN
10 Indoor Fan overload signal (T1J9) Fan overload CTB R
11 Indoor Fan overload source (T1J8) PMR Fan overload
PMR
1 Ground CTB C PMR Device
2 Phase Monitor Source (T1J6) UNIT SHUTDOWN PMR Device
3 Phase Monitor Normally Closed Signal (T1J7) PMR Device CONTL BOARD
UNIT
SHUTDOWN
REMOTE
SHUTDOWN
Remote Disable Switch if installed (T1J4 and
T1J5)
SMOKE SHUTDOWN PMR
SMOKE
SHUTDOWN
Normally Closed Smoke Detector Contact (T1J3) Smoke Detect or REMOTE SHUTDOWN
24V OUT Smoke Detector Controller Power (T1J2) CONTL BOARD Smoke Detector
C Smoke Detector Controller Common CTB C Smoke Detector
R Spades Transformer1PowerafterSafetyChain(T1J9) CONTL BOARD
C Spades Ground CONTL BOARD
The References above for T1J1 through T1J9 are to show the path of transformer 1 as is goes through the board and safety devices.
ComfortLINK v2.X
Page view 68
1 2 ... 64 65 66 67 68 69 70 71 72 73 74 ... 103 104

Comments to this Manuals

No comments