Carrier 33ZCVAVTRM Specifications Page 135

  • Download
  • Add to my manuals
  • Print
  • Page
    / 316
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 134
9
SUPPLY AIR TEMPERATURE (SAT) SENSOR INSTAL-
LATION The 33ZCSENSAT supply air temperature sensor
is required for controller operation. The sensor consists of a
thermistor encased within a stainless steel probe. The SAT
sensor probe is 6-in. nominal length with 114 in. of unshielded,
2-conductor 18 AWG twisted-pair cables. The sensor tempera-
ture range is –40 to 245 F with a nominal resistance of
10,000 ohms at 77 F. The sensor measures accuracy of
±0.36 F. The SAT sensor is supplied with a gasket and 2 self-
drilling mounting screws.
NOTE: The sensor must be mounted in the discharge of the
unit, downstream of the cooling coil and heat exchanger. Be
sure the probe tip does not come in contact with any of the
unit surfaces. See Fig. 9 and 10 for mounting location.
Do not run sensor or relay wires in the same conduit or race-
way with Class 1 AC service wiring. Do not abrade, cut, or
nick the outer jacket of the cable. Do not pull or draw cable
with a force that may harm the physical or electrical properties.
Avoid splices in any control wiring.
Perform the following steps to connect the SAT sensor to
the PremierLink™ controller:
1. Locate the opening in the control box. Pass the sensor
probe through the hole.
2. Drill or punch a
1
/
2
-in. hole in the unit.
3. Use two field-supplied, self-drilling screws to secure the
sensor probe to the unit.
4. Connect the sensor leads to the PremierLink controllers
wiring harness J6-3,4 board at the terminals labeled SAT
(ORN) and GND (BRN). See Fig. 7.
Perform the following steps if state or local code requires
the use of conduit, or if the installation requires a cable length
of more than 8 ft:
1. Secure the probe to the unit with two field-supplied
self-drilling screws.
2. If extending cable length beyond 8 ft, use plenum rated,
20 AWG, twisted pair wire.
3. Connect the sensor leads to the PremierLink controllers
wiring harness terminal board at the terminals labeled
SAT (ORN) and GND (BRN).
4. Neatly bundle and secure excess wire.
J6
6
7
RED
BLK
RED
RED
BLK
BLK
BLK
RED
BLK
RED
SENSOR 1 SENSOR 2 SENSOR 3 SENSOR 4
J6
6
7
RED
BLK
RED
BLK
SENSOR 2
SENSOR 1
RED
RED
BLK
SENSOR 3
SENSOR 4
BLK
BLK
RED
RED
RED
BLK
BLK
SENSOR 8
SENSOR 9
SENSOR 5
RED
BLK
SENSOR 6
SENSOR 7
BLK
RED
SPACE TEMPERATURE AVERAGING — 4 SENSOR APPLICATION
SPACE TEMPERATURE AVERAGING — 9 SENSOR APPLICATION
Fig. 8 — Space Temperature Averaging
LEGEND
Factory Wiring
Field Wiring
Page view 134
1 2 ... 130 131 132 133 134 135 136 137 138 139 140 ... 315 316

Comments to this Manuals

No comments